TPA for Phase-I has been obtained. Water requirement will be met from Brahamani riverand 42 cusecs of water has been sanctioned. It was reported that no national park,sanctuary or elephant / tiger reserve I within 10 km radius; however, 5 reserve forest arewithin 8.5 km radius. The public hearing was conducted on 13.09.2007. Capital cost ofthe project is Rs 4440.80 crores, which includes Rs 403.50 crores for environmentalprotection measures.3. The proposal has been considered and Ministry of Environment & Forests herebyaccords environmental clearance to 1050 MW (3x350 MW) Thermal Power Project asphase-I under the provisions of Environment Impact Assessment Notification, 2006subject to implementation of the following terms and conditions:-(i)(ii)The total land requirement shall not exceed 1040 acres for all the activities/facilities of the power project for phase-I.It shall be ensured that all the facilities/utilities of the proposed power projectincluding ash pond and colony shall be at least 500 m away from nationalhighway, railway and flood plains of the riverine system.(iii) Ash and sulphur content in the coal to be used in the project shall not exceed 42%and 0.39% respectively.(iv)(v)(vi)(vii)(viii)(ix)(x)A multi-flue stack of 275 m height with exit velocity of not less than 25 m/sshall be provided with continuous online monitoring system.High efficiency Electrostatic Precipitators (ESPs) with efficiency shall beinstalled so as to ensure that particulate emissions do not exceed 100 mg/Nm 3 .Space provision shall be made now itself for Flue Gas De-sulphurisation (FGD)unit of requisite efficiency of removal of SO 2 , if required at a later stage.Water requirement shall not exceed 37 cusecs. No ground water shall be extractedfor the project at any stage including construction phase.Closed circuit cooling system with cooling towers shall be provided. COC of atleast 5 shall be adopted.For controlling fugitive dust, regular sprinkling of water in the coal handling areaand other vulnerable areas of the plant shall be ensured.The project authorities should adhere to the provisions stipulated in the fly ashnotification of September, 1999 and as amended in August, 2003 in regard to flyash utilization. Unutilized fly ash shall be disposed off in the ash pond throughHCSD system and balance bottom ash through medium slurry mode.78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!