13.07.2015 Views

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(xvi) Vehicular emissions shall be kept under control and regularly monitored.Measures shall be taken for maintenance of vehicles used in mining operationsand in transportation of mineral. The vehicles should be covered with a tarpaulinand shall not be overloaded...5/-(xvii) Minerals handling plant should be provided with adequate number of highefficiency dust extraction system. Loading and unloading areas including all thetransfer points should also have efficient dust control arrangements. These shouldbe properly maintained and operated.(xviii) Blasting operation should be carried out only during the daytime. Controlledblasting should be practiced. The mitigative measures for control of groundvibrations and to arrest fly rocks and boulders should be implemented.(xix)(xx)(xxi)Drills shall either be operated with dust extractors or equipped with waterinjection system.Consent to operate shall be obtained from the State Pollution Control Board priorto start of enhanced production from the mine.Sewage treatment plant should be installed for the colony. ETP should also beprovided for workshop and wastewater generated during mining operation.(xxii) The project proponent shall take all precautionary measures during miningoperation for conservation and protection of endangered fauna such as python etc.spotted in the study area. Action plan for conservation of flora and fauna shall beprepared and implemented in consultation with the State Forest and WildlifeDepartment. Necessary allocation of funds towards the cost of implementation ofthe plan and/or Regional Wildlife Management Plan for conservation of flora andfauna so prepared by the State Government shall be made. The amount socontributed shall be included in the project cost. A copy of action plan may besubmitted to the Ministry and its Regional Office, Bhubaneswar within 3 months.(xxiii) A Final Mine Closure Plan along with details of Corpus Fund should be submittedto the Ministry of Environment & Forests 5 years in advance of final mine closurefor approval.B. General conditions(i)(ii)No change in mining technology and scope of working should be made withoutprior approval of the Ministry of Environment & Forests.No change in the calendar plan including excavation, quantum of mineralmanganese ore and bauxite and waste shall be made.40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!