13.07.2015 Views

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

MINING AND INDUSTRIALISATION UPDATE, ORISSA - Vasundhara

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(xi)(xii)Control Board in this regard...4/-The project authority should implement suitable conservation measures toaugment ground water resources in the area in consultation with the RegionalDirector, Central Ground Water Board.Regular monitoring of ground water level and quality should be carried out in andaround the mine lease. The monitoring should be carried out four times in a year ?pre-monsoon (April-May), monsoon (August), post-monsoon (November) andwinter (January) and the data thus collected may be sent regularly to Ministry ofEnvironment and Forests, its Regional Office located at Bhubaneswar, CentralGround Water Authority and Regional Director, Central Ground Water Board.(xiii) The project proponent shall obtain necessary prior permission of the competentauthorities for drawl of requisite quantity of water (surface water and groundwater) for the project.(xiv)(xv)(xvi)Suitable rainwater harvesting measures on long term basis shall be planned andimplemented in consultation with Regional Director, Central Ground WaterBoard.The project authorities should undertake sample survey to generate data on preprojectcommunity health status within a radius of 1km from proposed mine.Vehicular emissions shall be kept under control and regularly monitored.Measures shall be taken for maintenance of vehicles used in mining operationsand in transportation of mineral. The vehicles should be covered with a tarpaulinand shall not be overloaded.(xvii) Drilling and blasting operations shall not be carried out.(xviii) Consent to operate shall be obtained from SPCB before starting production fromthe mine.(xix)(xx)The project proponent shall take all precautionary measures during miningoperation for conservation and protection of endangered fauna namely tiger,panther etc. spotted in the study area. Action plan for conservation of flora andfauna shall be prepared and implemented in consultation with the State Forest andWildlife Department. Necessary allocation of funds for implementation of theconservation plan shall be made and the funds so allocated shall be included in theproject cost. Copy of action plan may be submitted to the Ministry and itsRegional Office within 3 months.A Final Mine Closure Plan along with details of Corpus Fund should be submittedto the Ministry of Environment & Forests 5 years in advance of final mine closurefor approval...5/-55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!