6. Any appeal against this environmental clearance shall lie with the NationalEnvironment Appellate Authority, if preferred within a period of 30 days as prescribedunder Section 11 of the National Environment Appellate Act, 1997.Copy to:(i)(SATISH C. GARKOTI)Additional Director (S)The Secretary, Ministry of Mines, Government of India, Shastri Bhawan, NewDelhi.(ii)(iii)(iv)(v)The Secretary, Department of Environment, Government of Orissa, Secretariat,Bhubaneswar.The Secretary, Department of Mines and Geology, Government of Orissa,Secretariat, Bhubaneswar.The Secretary, Department of Forests, Government of Orissa, Secretariat,Bhubaneswar.The Chief Wildlife Warden, Government of Orissa, Bhubaneswar.(vi) The Chairman, Central Pollution Control Board, Parivesh Bhawan, CBD-cum-Office Complex, East Arjun Nagar, Delhi-110032.(vii)The Chief Conservator of Forests, Regional Office (EZ), Ministry of Environmentand Forests, A-3 Chandrashekharpur, Bhubaneshwar-751023.(viii) The Chairman, Orissa State Pollution Control Board, Parivesh Bhawan, A/118Nilakantha Nagar, Unit-VIII, Bhubaneshwar-751012.(ix)(x)The Member Secretary, Central Ground Water Authority, A2, W3 Curzon RoadBarracks, K.G. Marg, New Delhi-110001.The District Collector, Rayagada District, Government of Orissa.(xi)(xii)EI Division, Ministry of Environment & Forests, EI Division, New Delhi.Monitoring File...8/-(xiii) Guard File.(xiv)Record File.(SATISH C. GARKOTI)(Additional Director (S)58
Expansion of Raikela Iron Ore Mining Project of M/sGeetarani Mohanty located in Village Raikela, TehsilBonai, District Sunderarh, Orissa-environmentalclearance reg.No. J-11015/380/2006-IA.II(M)Government of IndiaMinistry of Environment & ForestsParyavaran Bhavan,C.G.O. Complex, Lodi Road,New Delhi-110003.Dated the 2 nd July, 2008ToM/s Geetarani MohantyStation Road, Barbil,Keonjhar,<strong>ORISSA</strong>-758 035E: mail: sahoo_ore@yahoo.co.inSubject:Expansion of Raikela Iron Ore Mining Project of M/sGeetarani Mohanty located in Village Raikela, TehsilBonai, District Sunderarh, Orissa-environmentalclearance reg.Sir,This has reference to your letter No. 231/GRM/MoEF/05-06 dated 17.03.2006and subsequent letters dated 05.12.2006, 27.07.2007, 15.10.2007, 17.12.2007,23.03.2008 and 02.04.2008 on the subject mentioned above. The proposal is forenhancement of production of iron ore from 0.142 million tonnes per annum (millionTPA) to 0.864million TPA. The total mine lease area of the project is 67.586ha, out ofwhich 66.671ha is forestland and 0.915ha is others (Sarba Sadharana). Area proposedfor mining is 50.893ha, an area of 3ha is kept for over burden dump, 4.568ha for mineralstorage, 0.2ha for infrastructure, 2.985ha for roads, 2.603ha for green belt, 2.422ha formineral separation plant and 0.915ha is others. It has been proposed that the SarbaSadharana land of 0.915ha will not be acquired. The Suna Nallah is located at a distanceof 1km toward North West boundary of mine lease area. The Karo River is reported tobe located at a distance of 7.5km in South West of the mine lease. No nationalpark/wildlife sanctuary/biosphere reserve/tiger reserve/elephant reserve etc. is reportedto be located in the core and buffer zone of the mine and that the area does not report to59
- Page 1 and 2:
MINING AND INDUSTRIALISATIONUPDATE,
- Page 3 and 4:
N e wsMONTH-JULYMemorial pillar for
- Page 5 and 6:
and plants, heat emitted by chemica
- Page 7 and 8: Langjigarh, Vedanta group spokesman
- Page 9 and 10: that as 17 steel companies have pre
- Page 11 and 12: opportunities,” company sources s
- Page 13 and 14: wells, Rs 1.57 crore to the Public
- Page 15 and 16: Similarly, the aluminium sale incre
- Page 17 and 18: The fertiliser plants use the conve
- Page 19 and 20: participants from different promoti
- Page 21 and 22: BHUBANESWAR, July 31: NationalAlumi
- Page 23 and 24: Reddy Pratap Chandra Sarangi and Bi
- Page 25 and 26: up to 50 percent power generated at
- Page 27 and 28: Govindpur and Dhinkia villages. The
- Page 29 and 30: near the Bhushan plant. At the revi
- Page 31 and 32: environmental protection. Tata Stee
- Page 33 and 34: Export of iron ore uncheckedThe Hin
- Page 35 and 36: ENVIRONMENTAL CLEARANCEMINING PROJE
- Page 37 and 38: Bonai Division, has been submitted
- Page 39 and 40: data.(viii) Plantation shall be rai
- Page 41 and 42: (iii)(iv)(v)(vi)(vii)Four ambient a
- Page 43 and 44: Copy to:(SATISH C. GARKOTI)Addition
- Page 45 and 46: drilling and blasting. The targette
- Page 47 and 48: (xi)(xii)plant, loading and unloadi
- Page 49 and 50: (vi)(vii)Measures should be taken f
- Page 51 and 52: ..8/-(v)The Chief Wildlife Warden,
- Page 53 and 54: (0.0015million TPA) of graphite. Th
- Page 55 and 56: (xi)(xii)Control Board in this rega
- Page 57: expenditure should be reported to t
- Page 61 and 62: (iii)(iv)(v)(vi)(vii)The mining ope
- Page 63 and 64: (xvi)Appropriate mitigative measure
- Page 65 and 66: (xi) The project authorities should
- Page 67 and 68: 2x60 MW Coal based Thermal Power Pr
- Page 69 and 70: submitted to the Ministry as well a
- Page 71 and 72: 4. The Chairman, Orissa State Pollu
- Page 73 and 74: Environment Impact Assessment Notif
- Page 75 and 76: (xxiii) Full cooperation shall be e
- Page 77 and 78: 1050 MW Phase-I of 2250 MW Malaxmi
- Page 79 and 80: (xi)(xii)(xiii)The ash pond shall b
- Page 81 and 82: 3. The Chairman, Central Electricit
- Page 83 and 84: Talcher. No National Park or Wildli
- Page 85 and 86: (xxiii) Regular monitoring of the a
- Page 87 and 88: PENDING PROJECTS WITH MOEF FORENVIR
- Page 89 and 90: FOREST CLEARANCECLEARED MINING PROJ
- Page 91 and 92: PENDING PROJECTS WITH MOEF FORFORES