13.07.2015 Views

FINAL REPORT - psflibrary.org

FINAL REPORT - psflibrary.org

FINAL REPORT - psflibrary.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DAY 3No Time Programme1 08.00 – 09.00 Module 5:Estimating construction cost of MHPPTariff Setting2 09.00 – 10.00 Module 5:Operational and MaintenanceMicrohydro planning in Green PNPMEstablishment of MHPP Management (local institution)Scheduling and Estimating Volume of CivilConstruction3 10.00 – 10.20 Coffee Break4 10.20 - 11.30 Exercise and Group Discussion on microhydro :-Design and planning of microhydro in the context ofGreen PNPM-Design block grant funding for solar energytechnology- Participatory Approach: Incorporating LocalMaterials and Voluntary Works (Gotong Royong)during Construction5 11.30 - 12.30 Module 4: Introduction to Biomass EnergyTechnology- Introduction to Biogas Technology- Biogas potential- Digester Types: Continue or Batch System- Raw Materials- Operational and Maintenance- Cost estimationTrainer / Person(s)in ChargeIr. Akhmad Taufik, MTIr. Akhmad Taufik, MTIr. Akhmad Taufik, MTAndrias Wiji, STMaterialHandouts (power point)Handouts (power point)Handouts (power point)Handouts (power point)34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!