13.07.2015 Views

2010 Port Waste Reception and Handling Plan - Port of Rotterdam

2010 Port Waste Reception and Handling Plan - Port of Rotterdam

2010 Port Waste Reception and Handling Plan - Port of Rotterdam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Category Fee (€) delivery entitlementAnnex Vship-related (m 3 )ABCDEFGsmall dangerous waste(Annex V) discountship-related (€)195 3 80275 6 150A tariff has been chosen to cover both collection <strong>and</strong> processing costs. The fee for domestic waste isbased on the number <strong>of</strong> crew members on board. The prevailing delivery pattern <strong>and</strong> dimensions <strong>of</strong>collection facilities (waste containers) have resulted in two classes:• ships with < 12 crew members with a maximum <strong>of</strong> 3 m³ <strong>of</strong> waste delivery;• ships with > 12 crew members with a maximum <strong>of</strong> 6 m³ <strong>of</strong> waste delivery.If the waste has been compressed, the waste volume <strong>of</strong>fered is multiplied by a factor <strong>of</strong> 3. This inconnection with the higher processing costs <strong>of</strong> compressed waste.Service levelVia Annex V waste collector Bek & Verburg B.V. the following services are <strong>of</strong>fered:• Reimbursements apply for delivery from Monday to Saturday inclusive from 07:30 to 17:30 hours;• Maximum st<strong>and</strong>-by time <strong>of</strong> 30 minutes for collection vessels <strong>and</strong> Trucks is guaranteed in the case<strong>of</strong> notification 24 hours prior to arrival or at the latest upon departure from the previous port;• Tariffs are based on “one stop <strong>and</strong> go”, i.e. ship or lorry comes alongside, loads waste stream<strong>and</strong> departs.3.4 Ships outside the financing schemeA fee for ship waste is not charged for the use <strong>of</strong> the <strong>Rotterdam</strong>-Rijnmond <strong>Port</strong> Region by:• vessels for which an exemption has been granted pursuant to Article 35a <strong>of</strong> the Wvvs from theprovisions under or pursuant to Articles 6a, 12a or 12b <strong>of</strong> the Wvvs• vessels equipped or used commercially for sports or leisure purposes <strong>and</strong> which may notcarry more than 12 passengers.• fishing vessels• dredgers• sounding vessels• port tugboats, only if <strong>and</strong> ins<strong>of</strong>ar as these are used within the framework <strong>of</strong> normal assistanceto seagoing vessels when entering or leaving <strong>of</strong> the <strong>Port</strong>• a seagoing vessel which visits the port in transit to/from the hinterl<strong>and</strong> or exclusively forbunkering, provided that the ship does not stay in the <strong>Port</strong> for longer than four hours• seagoing vessels which use gas oil or LNG (MDO/MGO/LNG) as propulsion fuel, only ins<strong>of</strong>aras these vessels deliver oily ship wasteIt speaks for itself that the notification <strong>and</strong> delivery obligations apply in full to these categories <strong>of</strong> ship<strong>and</strong> that they fall under the direct financing scheme.Version 3 October 2009 page 11 <strong>of</strong> 36 <strong>2010</strong> <strong>Port</strong> <strong>Waste</strong> <strong>Reception</strong> <strong>and</strong> H<strong>and</strong>ling <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!