13.07.2015 Views

request for letters of interest - Broward Sheriff's Office

request for letters of interest - Broward Sheriff's Office

request for letters of interest - Broward Sheriff's Office

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TECHNICAL PROVISIONS PAGE 9SECTION 3.1SUMMARY OF WORKPART 1 - GENERAL3.1.1 SCOPE OF WORK:3.1.1.1. The Scope <strong>of</strong> Work shall include the provision <strong>of</strong> all supervision, projectcoordination, scheduling, construction management, labor, equipment, tools,supplies, insurance, permanent materials, temporary materials, vehicles,storage sheds (if required), clean-up, and incidentals (including acquisition <strong>of</strong>all agency permits and inspections) required <strong>for</strong> the project.3.1.1.2 The extent <strong>of</strong> the Project will include, as a minimum, the followingconstruction trades and/or disciplines: Supervision, Scheduling, Permitting,Safety Coordination, Security, Plumbing and Electrical Work.3.1.1.3 Any work, materials or equipment that may reasonably be inferred from thescope <strong>of</strong> services as being required to produce the intended result shall besupplied by the Contractor whether or not specifically called <strong>for</strong> in thesetechnical specifications.3.1.1.4 Be<strong>for</strong>e installation <strong>of</strong> any new work, verify the location, size and otherconditions at all points <strong>of</strong> connection to services or other existing equipment,piping or ductwork and at all locations where new work will cross or passnear existing equipment, piping, ductwork, electrical or other facilities andcomplete the survey as outlined below.3.1.1.5. The scope <strong>of</strong> the project includes, but is not limited to:3.1.1.5.1 Have all the required licenses to per<strong>for</strong>m the Work.3.1.1.6 SURVEY: The Contractor shall per<strong>for</strong>m a detailed survey <strong>of</strong> theexisting conditions. Any discrepancies or conflicts between existing fieldconditions and the written specifications and/or drawings shall be brought tothe attention <strong>of</strong> the Project Manager immediately following the survey andprior to the start <strong>of</strong> work. It is the sole responsibility <strong>of</strong> the Contractor tocomplete the project as defined in these specifications. Any change orders<strong>request</strong>ed by the Contractor resulting from field conditions that, in the opinion<strong>of</strong> the Project Manager, should have been discovered during the initial surveywill not be accepted. The survey shall include visual inspection and inventory<strong>of</strong> all devices, conduit and wiring.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!