ATTACHMENT “A” Page 2Contractor shall furnish all labor, materials and equipment necessary to install asewerage grinding system as designed by the Pr<strong>of</strong>essional Engineer. Contractor shallcoordinate all work schedules with the <strong>Broward</strong> Sheriff’s <strong>Office</strong> Project Manager orhis designee. The road between the Kitchen Warehouse and the Rein Facility may beclosed only during working hours. All other roads must remain accessible at alltimes, unless BSO is notified 24 hours prior to the closing. The contractor shallremove debris from the site on a daily basis; wind borne debris will not be tolerated.Contractor shall coordinate with the <strong>Broward</strong> Sheriff <strong>Office</strong> <strong>for</strong> locations <strong>of</strong> storageareas <strong>for</strong> materials and equipment. At completion <strong>of</strong> work, contractor shall refurbishall damaged landscape materials, irrigation systems, roadways, sidewalks, curbs andgutters to like new condition..1.2 Provide remote Alarm Notification System to the Control Center <strong>of</strong> the KitchenFacility, in location as selected by BSO. Provide blinking light alarm notificationlamp mounted on the top <strong>of</strong> the sewer grinder control panel. Provide lock on controlpanel.1.3 Demolition: Contractor shall be responsible <strong>for</strong> removing and disposing <strong>of</strong> alldemolished materials.1.4 General Notes: Proposal shall include all excavation <strong>for</strong> trenches, patching <strong>of</strong> asphaltpavement, repair <strong>of</strong> irrigation piping, replacement and installation <strong>of</strong> new sod, cleanup and removal <strong>of</strong> all debris. Vendor shall be responsible <strong>for</strong> providing electricalpower to all devices requiring electricity.1.5 Warranty: System shall have minimum one year warranty from the contractor andstandard manufacturer’s warranties/guarantees <strong>for</strong> all equipment. Provide separatequotation <strong>for</strong> one (1), two (2) year labor and material maintenance agreement withthree (3), one (1) year renewal periods. Maintenance agreement shall specifymaximum <strong>of</strong> 24 hour response time to each event.SECTION II: CREDENTIAL/CRITERIA REQUIREMENTS:2.1 Eligibility: To be eligible to qualify as a proposer, the following minimum requirementsmust be met.2.1.1 The firm must be established as a legal entity and authorized to do business in theState <strong>of</strong> Florida.2.1.2 The firm must be licensed and/or registered in the State <strong>of</strong> Florida in all requireddisciplines.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!