13.07.2015 Views

request for letters of interest - Broward Sheriff's Office

request for letters of interest - Broward Sheriff's Office

request for letters of interest - Broward Sheriff's Office

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TECHNICAL PROVISIONS PAGE 19Project Manager, is submitted by CONTRACTOR.3.4.5.5. Contractor shall not be authorized to begin mobilization at the Project siteuntil the Construction Schedule is approved by BSO.3.4.5.6. Shop Drawings: Provide newly-prepared in<strong>for</strong>mation, on reproductive sheets,with graphic in<strong>for</strong>mation at accurate scale (except as otherwise indicated),with name <strong>of</strong> preparer indicated (including firm name). Show dimensions andnote which are based on field measurement. Identify materials and productsin the work shown. Indicate compliance with standards, and specialcoordination requirements. Do not allow construction and shop drawingcopies without appropriate final "Action" markings by BSO to be used inconnection with the work.3.4.5.7. Submit five (5) blue-line or black-line prints; three (3) will be returned.3.4.5.8.. Specifications and Product Data: Collect required data into one submittal <strong>for</strong>each unit <strong>of</strong> work and mark each copy to show which choices and options areapplicable to project. Include manufacturer's standard printedrecommendations <strong>for</strong> application and use, compliance with standards,application <strong>of</strong> labels and seals, notation <strong>of</strong> field measurements that have beenchecked, and special coordination requirements. Maintain at least one set <strong>of</strong>product data (<strong>for</strong> each submittal) at project site, available <strong>for</strong> reference byBSO's Project Manager and others.3.4.5.9. Submittals: Do not submit product data, or allow its use on the project, untilcompliance with requirements <strong>of</strong> contract documents has been confirmed.Submittal is <strong>for</strong> in<strong>for</strong>mation and record, unless otherwise indicated. Initialsubmittal is final submittal unless returned promptly by BSO and marked withan "Action" which indicates an observed non-compliance. Submit 5 copies.3.4.5.10. Samples: Provide units identical with final condition <strong>of</strong> proposed materials orproducts <strong>for</strong> the work. Include "range" samples (not less than units) whereunavoidable variations must be expected, and describe or identify variationsbetween units <strong>of</strong> each set. Provide full set <strong>of</strong> optional samples where BSOselection is required. Prepare samples to match BSO's sample where soindicated. Include in<strong>for</strong>mation with each sample to show generic description,source or product name and manufacturer, limitations, and compliance withstandards. Samples are submitted <strong>for</strong> review and confirmation <strong>of</strong> color,pattern, texture and "kind" by BSO. BSO will test samples (except asotherwise indicated or <strong>request</strong>ed) <strong>for</strong> compliance with other requirements.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!