13.07.2015 Views

Degree Master Manual D2 - icemeister.net

Degree Master Manual D2 - icemeister.net

Degree Master Manual D2 - icemeister.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Typical application wiringNote that wiring instructions differ depending onthe main power.If the Load Center is operatingon 120VAC power:For compressor or valve control(L1 power leg is used)Take power for the controlled device from J4(normally closed contacts) or J5 (normally opencontacts) and from an available neutral connectionon the load center.For light control(L1 power leg is used)Connect one side of the light ballast to J3 and theother to an available neutral connection on the loadcenter.For fan or defrost control(L2 power leg is used)For fans, connect one side of the load to J1 andthe other side to an available neutral on the loadcenter.For defrost, connect one side of the load to J2and the other side to an available neutral on theload center.If the Load Center is operatingon 240VAC power:For compressor or valve control( L1 power leg is used)Take power for the controlled device from J4(normally closed contacts) or J5 (normally opencontacts) and from an empty L2 connection on theload center.For light control(L1 power leg is used)Connect one side of the light ballast to J3 and theother to an available L2 connection on the loadcenter.For fan or defrost control(L2 power leg is used)For fans, connect one side of the load to J1 andthe other side to an available L1 connector on theload center.For defrost, connect one side of the load to J2and the other side to an available L1 connector onthe load center.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!