13.07.2015 Views

Geotextiles in Embankment Dams - Association of State Dam Safety ...

Geotextiles in Embankment Dams - Association of State Dam Safety ...

Geotextiles in Embankment Dams - Association of State Dam Safety ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C.3.0419 [Sewn seams:1. Interlock<strong>in</strong>g or sewn twice.2. Thread:a. Contrast<strong>in</strong>g color.b. Chemical resistance: Equal to geotextile.3. Sew geotextiles cont<strong>in</strong>uously. Spot sew<strong>in</strong>g is not allowed.4. Sewn seam strength: Not less than 70 percent <strong>of</strong> parent materialstrength.]20 [RIPRAP INSTALLATIONA. Place riprap or backfill material so as not to damage geotextile.1. Type 1 riprap: Place directly on 4 oz geotextile with drop heightnot exceed<strong>in</strong>g 3 feet.2. Type 2 riprap: Place directly on 16 oz geotextile with drop heightnot exceed<strong>in</strong>g 1 foot.3. Type 3 riprap: Use with 4 <strong>in</strong>ch gravel cushion over 16 oz.geotextile. Place with drop height not exceed<strong>in</strong>g 1 foot.B. Before plac<strong>in</strong>g riprap, demonstrate that plac<strong>in</strong>g technique will not damagegeotextile or underly<strong>in</strong>g geomembrane. If the demonstration does notshow that riprap can be <strong>in</strong>stalled without damag<strong>in</strong>g geotextile, modifyriprap plac<strong>in</strong>g technique (such as reduc<strong>in</strong>g drop height, <strong>in</strong>stall<strong>in</strong>gadditional layer <strong>of</strong> sacrificial geotextile, or <strong>in</strong>stall<strong>in</strong>g additional gravelcushion).C. Beg<strong>in</strong> riprap placement at toe and proceed up slope.]3.05 REPAIRSA. At placement, geotextile will be rejected if it has defects, rips, holes,flaws, deterioration, contam<strong>in</strong>ation, or damage.B. Replace or repair geotextile damaged dur<strong>in</strong>g <strong>in</strong>stallation or placement <strong>of</strong>cover <strong>in</strong> the follow<strong>in</strong>g manner:1. Remove cover from damaged area <strong>of</strong> geotextile.2. Remove any soil or other material which may have penetrated torngeotextile.19 Delete if sewn seams not allowed or required.20 Delete if riprap not used on job. Modify as appropriate for other materials. If riprap is used,delete redundancies between this section and Section 02375 – Riprap.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!