13.07.2015 Views

PDF - Centralia College

PDF - Centralia College

PDF - Centralia College

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

opportunity for refreshments, studying, and group interaction exists. These factors willdefinitely increase the evening and weekend usage, resulting in higher FTE production.Educational focus will be in high demand programs with emphasis on math, humanitiesand developmental programs.8.0 CAPITAL COST DEVELOPMENTProject Cost: An estimate of the cost of construction and the project was preparedbased on preliminary drawings and a detailed cost estimate of plans developed:Item Cost (Escalated @ 3.5% to 2011)Area (Square Feet) 69,980 SFConstruction Cost $27,777,000Construction $/SF $397/SFProject Cost $41,252,401Project $/SF $589.48/SF (See C-100 in Appendix A)Comparisons of similar SBCTC projectsThe construction cost of the Kemp Hall & Student Services Replacement Facility iscomparable to other similar state funded projects.(See Appendix A for Comparable Construction Costs)Anticipated Funding Sources: This is a collaborative project with the AssociatedStudents of <strong>Centralia</strong> <strong>College</strong> (ASCC) and the <strong>Centralia</strong> <strong>College</strong> Foundation as partners.The ASCC approved a building debt service fee which will provide $3 million inCertificate of Participation (COP) funding for student program space. In addition, theFoundation has committed to raise $1 million in a capital campaign to help expand thefacility to allow community use. Finally, the <strong>College</strong> will apply local capital funds in theamount of $1.05 million to the project as well. This amounts to $5.05 million contributedto the project, underscoring the importance to the campus, students, and community.9.0 OPERATING BUDGETS IMPACTS: The estimated cost to operate thisbuilding is $9.05 per foot based on projected annual expenditures as averaged andescalated by the SBCTC. Based on this figure, the total annual operational costs will be$633,500. It includes an additional 4.5 FTES.10.0 SCHEDULE AND IMPLEMENTATION: The replacement project wouldcommence in July, 2009 and open for Summer Quarter, 2013. This request is for aproject that would commence design in the upcoming 2009 – 2011 Biennium. It is timedto meet the long range programmatic and facility needs of <strong>Centralia</strong> <strong>College</strong>. The<strong>College</strong> is currently prepared for the project, with a capital campaign in the works, andlocal funding identified and reserved. Based upon the owners funding the pre-design, theproject will proceed for approval with the pre-design and programming analysis,followed by design, bid and construction. The method of construction will be design-bidbuildwith bid documents scheduled for January of 2011.10 Kemp Hall & Student Services Building Replacement Project

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!