13.07.2015 Views

PDF - Centralia College

PDF - Centralia College

PDF - Centralia College

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Deferred Maintenance and Repair BacklogBoth facilities are extremely high maintenance, requiring extensive repair work annually.The 2007 Facility Condition Survey conducted by Pack and Associates identified nearly$1.3 million of required repair work. If these facilities were replaced, this backlog wouldbe eliminated. The following list of deficiencies was identified:Facility Deficiency Estimated CostKemp Electrical System $155,500Kemp Fire System $60,000Kemp HVAC $345,000Kemp Exterior Doors/Siding $72,000Student Services Exterior Windows/Doors $250,300Student Services Exterior Siding $252,000Student Services Upper Roof Membrane $116,875Total Estimated Costs $1,251,675Kemp Hall & Student Services Building Replacement ProjectAppendix D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!