13.07.2015 Views

View File - Development Services - City of Oxnard

View File - Development Services - City of Oxnard

View File - Development Services - City of Oxnard

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WATER RESOURCES TECHNICAL REPORT−Water deliveries from the Conejo Creek Diversion Project (4,000 AFY) added asadditional in-lieu water deliveries to <strong>of</strong>fset pumping demand in PTP and PVCWDwells.• FCGMA Cutbacks. Adding the final 10 percent FCGMA cutbacks to M&I wells withinthe FCGMA boundary, 5 percent in 2005 and 5 percent in 2010. This replaces thereduced pumping in Scenario 3 <strong>of</strong> the Inland Saline Intrusion Assessment Project, whichassumed an 8 percent weighted average cutback over 30 years to reach the full pumpingallocation cutback <strong>of</strong> 25 percent over this simulation period• Supplemental M&I Water Program. Adding the Supplemental M&I Water Program forthe O-H System. This program is described in Section 3.0 and involves delivering anestimated 4,000 AFY <strong>of</strong> water from the El Rio wellfield, which consist <strong>of</strong> Conejo Creekcredits, to PVCWD in lieu <strong>of</strong> groundwater pumping. These deliveries would be madeduring wet and average years as groundwater level conditions dictate in the Forebayarea. It is assumed that an average <strong>of</strong> 4,000 AFY are delivered over the 31-yearsimulation period, which would result in 5,167 AFY being delivered during the 24 wetand normal years and no deliveries in the dry years. It is assumed that water is pumpedfrom the following El Rio wells.Groundwater Recovery for the M&I ProgramWell1. El Rio # 152. El Rio # 53. El Rio # 64. El Rio # 75. El Rio # 116. El Rio # 87. El Rio # 38. El Rio # 2A9. El Rio # 4Pumpage750 AFY (465 gpm)500 AFY (310 gpm)750 AFY (465 gpm)750 AFY (465 gpm)500 AFY (310 gpm)500 AFY (310 gpm)500 AFY (310 gpm)750 AFY (465 gpm)167 AFY (104 gpm)These El Rio production wells (Nos. 2A, 3, 4, 5, 6, 7, 8, 11, and 15) are all located in the UASand exclude LAS wells.Phase 1 ScenariosThe objective <strong>of</strong> the Phase 1 scenarios is to maximize use <strong>of</strong> current facilities. Three scenariosare developed (1a, 1b, and 1c) to meet this objective. These scenarios are described below.Scenarios 1a and 1bScenarios 1a and 1b consist <strong>of</strong> the following:• Groundwater Recharge. 2,814 AFY <strong>of</strong> recycled water are equally delivered foragricultural irrigation to growers along the OVMWD Ocean <strong>View</strong> pipeline that pumpW112003002SCO LW1458.DOC/ 033390002 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!