13.07.2015 Views

RULES DET NORSKE VERITAS (DNV) = STRUCTURES = - Boat Design Net

RULES DET NORSKE VERITAS (DNV) = STRUCTURES = - Boat Design Net

RULES DET NORSKE VERITAS (DNV) = STRUCTURES = - Boat Design Net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Amended July 2011, see page 3 Rules for High Speed, Light Craft and Naval Surface Craft, January 2011Pt.3 Ch.1 Sec.2 – Page 19Fig. 8Sea load distribution factor502 The design pressure on superstructure end bulkheads and deckhouses shall not be taken less than:P min = 5 + (5 + 0.05 L) sin α (kN/m 2 )for lowest tier of unprotected frontP min =5 (kN/m 2 ) for aft end bulkheadsP min = 5 + 0.025 L sin α (kN/m 2 ) elsewherewhere α is the angle between the bulkhead/side and deck.h o , C W and k s as given in 501.a= 2.0 for lowest tier of unprotected fronts= 1.5 for deckhouse fronts= 1.0 for deckhouse sides= 0.8 elsewhere.503 The design pressure on watertight bulkheads (compartment flooded) shall be taken as:p = 10 h b (kN/ 2 )h bp = a k s ( C W – 0.67 h 0 ) ( kN ⁄ m 2 )= vertical distance in m from the load point to the top of bulkhead or to flooded waterline, if deeper.504 The design pressure on deck or inner bottom forming part of watertight bulkhead shall not be less thanfor the bulkhead at same level.C 600 Liquids601 Tanks for bunkers and tank bulkheads shall normally be designed for liquids of density equal to that ofsea water, taken as ρ = 1.025 t/m 3 (i.e. ρ g 0 ≅ 10).602 The pressure in tanks shall be taken as the greater of:p = ρ (g 0 + 0.5 a v ) h s (kN/m 2 )p = 0.67 ρ g 0 h p (kN/m 2 )<strong>DET</strong> <strong>NORSKE</strong> <strong>VERITAS</strong> AS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!