13.07.2015 Views

DateLaboratory Testing of Portland Cement Concrete Patch Material ...

DateLaboratory Testing of Portland Cement Concrete Patch Material ...

DateLaboratory Testing of Portland Cement Concrete Patch Material ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

It is desirable for a patch material to have an equal or lower permeability than anyconcrete it is being placed on top <strong>of</strong> (i.e. the existing pavement), to avoid the buildup <strong>of</strong>water at the concrete interface. The permeability test results are shown in Table 11 below.The Denka CSA #20 (Sample 4) and Tetraguard AS20 (Sample 10) were generally lesspermeable than the control. The patch materials containing Type K cement andKomponent (Samples 2 and 3), on the other hand, were more permeable than the control.The permeability <strong>of</strong> the Type K cement modified material was, in fact, so high that the 7-day and 28-day tests were terminated to prevent damage to the testing equipment.MODIFIED PATCH CHARGE CHLORIDESAMPLE MATERIAL SAMPLE PASSED, Q IONNUMBER DESCRIPTIONS AGE (Coulombs) PENETRABILITY123410Table 11. Permeability Test ResultsMn/DOT 3U18(Control)Mn/DOT 3U18 w/Type K <strong>Cement</strong>Mn/DOT 3U18 w/KomponentMn/DOT 3U18 w/Denka CSA #20Mn/DOT 3U18 w/Tetraguard AS207 DAY 5802 HIGH28 DAY 4759 HIGH90 DAY 4056 HIGH7 DAY terminated @ 165 min. VERY HIGH28 DAY terminated @ 345 min. VERY HIGH90 DAY 5830 HIGH7 DAY 6597 HIGH28 DAY 6455 HIGH90 DAY 5897 HIGH7 DAY 4815 HIGH28 DAY 4478 HIGH90 DAY 3644 MODERATE7 DAY 8693 HIGH28 DAY 3948 MODERATE90 DAY 2853 MODERATEQUALITATIVE RATINGSCHARGE PASSED,CHLORIDE IONQ (Coulombs)PENETRABILITYTest Terminated (TemperatureVERY HIGHreached 190° F before 360 min.)>4,000HIGH2,000-4,000MODERATE1,000-2,000LOW100-1,000VERY LOW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!