13.07.2015 Views

BALL LOCK ® MOUNTING SYSTEM QUICK CHANGE ... - Jergens Inc.

BALL LOCK ® MOUNTING SYSTEM QUICK CHANGE ... - Jergens Inc.

BALL LOCK ® MOUNTING SYSTEM QUICK CHANGE ... - Jergens Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

www.jergensinc.com<strong>BALL</strong> <strong>LOCK</strong> ®<strong>MOUNTING</strong> <strong>SYSTEM</strong>1Set-Up Reduction WorksheetBenefits of Set-Up Reduction (Capacity)Current MethodMinutes per set-up = minutesNumber of set-upsper 8 hour shift = set-upsTotal minutes of set-up per shift(set-up minutes x number of set-ups) = minutesUsing the Ball Lock ® SystemMinutes per set-up = minutesExample (actual case study):60 minutes1.5 set-ups90 minutes8 minutesINCH PRE-MACHINED FIXTURE/SUBPLATESNumber of set-upsper 8 hour shift = set-upsTotal minutes of set-up per shift(set-up minutes x number of set-ups) = minutes<strong>Inc</strong>reased capacity per machine per shift(current method - Ball Lock ® method) = minutesSavings per machine per shift = minutes<strong>Inc</strong>reased capacity(number of minutes / 60) = hours1.5 set-ups12 minutes78 minutes78 minutes1.3 hoursBenefits of Set-Up Reduction (Profit)Machine cost per hour = $ $80.00<strong>Inc</strong>reased production hours per shift(increased capacity from above) = hours 1.3 hoursSavings (profit) per machine per shift(machine cost per hour x increased = $ per machine $104.00 per machineproduction hours) per shift per shiftPhone 800-537-4367 or +1 216-486-5540 • Fax: +1 216-481-6193 • E-mail: info@jergensinc.com • www.jergensinc.com 1.15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!