13.07.2015 Views

Patricroft Bridge Baseline Report.pdf - Urbed

Patricroft Bridge Baseline Report.pdf - Urbed

Patricroft Bridge Baseline Report.pdf - Urbed

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Report</strong> by URBED with AGDRegeneration Initiatives and ProposalsEccles Town Centre<strong>Bridge</strong>water Canal Corridor MasterplanBarton AqueductThe town centre is a priority for improvement and avision and action plan is currently being prepared. Thenew Eccles Gateway Community and Health Centrehas recently opened. The new £20 million MagistratesCourt and Justice Centre in Eccles town centre willbe completed in 2012. A planning application for anew Tesco store at West One is due to be reported toplanning panel in the summer.Barton Strategic SiteThe development of a multi-modal freight terminal toinclude a 2 berth port, rail terminal and 200, 000 sqm of warehousing is subject to a planning applicationcurrently being considered by the Council.A priority project in Salford West is to transform thecanal and its environment into a leisure destination.This includes physical works as well as communityinvolvement, educational and heritage interpretation.Salford City Council has recently appointed URBEDand Landscape Projects to prepare a masterplan forthe canal corridor. The <strong>Bridge</strong>water Way is enhancing65km of the historic canal routes linking communities,the National Cycle and footpath networks and creatinga more accessible leisure asset. 8km of the towpathwill connect communities across the west of Salford.Physical works are planned for phase 3 from the M602to Monton. The 250th anniversary of the <strong>Bridge</strong>waterCanal is in 2011.Salford Forest ParkStreetscene ImprovementsCanal at Worsley DelphThe masterplan promoted by Peel for the site includesa racecourse, all weather track and grandstand, anequestrian centre, 80 bed hotel, golf course, clubhouse,forest park centre, woodland wildlife centre, exhibitionspace, demonstration eco village, camping andwoodland play area. A public inquiry into the schemehas recently been held a decision by the Secretary ofState is awaited.Implementation of the Salford West RegenerationFramework and Liverpool Road Strategy is underway.Streetscene improvements are currently drawn upfor consultation and it is anticipated that work willcommence in late 2009. The streetscene improvementswill include improved pedestrian crossings, new pavingand street furniture and remove street clutter. This willhelp to link the new primary school on Lewis Street to10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!