13.07.2015 Views

Level 2 Strategic Flood Risk Assessment (.pdf ... - Wigan Council

Level 2 Strategic Flood Risk Assessment (.pdf ... - Wigan Council

Level 2 Strategic Flood Risk Assessment (.pdf ... - Wigan Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RECORD OF MEETINGStatus:JBA Project Code 2009s0578Contract<strong>Wigan</strong> Borough <strong>Level</strong> 2 SFRAClient<strong>Wigan</strong> Metropolitan Borough <strong>Council</strong>Day, Date and Time 8/03/2011 13:30MeetingMeeting with the Environment Agency, <strong>Wigan</strong> Borough<strong>Council</strong> and JBAVenueEnvironment Agency, Appleton House, BirchwoodItemAgreed that as this study is not finalised, it can be included in theSFRA in future when the <strong>Flood</strong> Zone mapping is updated.4.6 The EA confirmed that this was to only outstanding issue for theSFRA. Following additional tabulation of the Zone 3 sites andcomments, the EA are prepared to sign off the <strong>Wigan</strong> SFRAAction5 Agreed Outcomes5.1 JBA will add a table to the main SFRA report listing the remaining<strong>Flood</strong> Zone 3 sites with comments on key flooding and developmentissues and likelihoods of passing the Exceptions Test. JBA willendeavour to present this to the <strong>Council</strong> and Environment Agency bythe close of play on 11 th March 2011.5.2 JBA will add a paragraph to the report on the availability of data for the<strong>Wigan</strong> <strong>Flood</strong> Alleviation Scheme.JBAJBAJeremy Benn Associates Limited, South Barn, Broughton Hall, Skipton, North Yorkshire BD23 3AE, UKhttp://www.jbaconsulting.co.ukPage 2 of 22009s0578-S-M003-1.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!