13.07.2015 Views

Level 2 Strategic Flood Risk Assessment (.pdf ... - Wigan Council

Level 2 Strategic Flood Risk Assessment (.pdf ... - Wigan Council

Level 2 Strategic Flood Risk Assessment (.pdf ... - Wigan Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Map Name Map Reference Map Title Descriptionas proposed <strong>Wigan</strong> development sites.Set J - Open Space 2009s0578 - D010_004 OPEN SPACE Displays sites of Open Space in <strong>Wigan</strong>, as well as new development sites thatintersect Open Space that is within 5 metres of a main river.Set J - Open Space 2009s0578 - D010_005 OPEN SPACE Displays sites of Open Space in <strong>Wigan</strong>, as provided by <strong>Wigan</strong> <strong>Council</strong>, whichcould potentially be used for <strong>Flood</strong> Alleviation. It also shows New DevelopmentSites that intersect Potential <strong>Flood</strong> Alleviation Sites.Set J - Open Space 2009s0578 - D010_006 OPEN SPACE -FLOODALLEVIATIONSITESDisplays areas of Open Space which are within 5m of a Main River and Potential<strong>Flood</strong> Alleviation Sites.Set K - <strong>Strategic</strong>Sites2009s0578 - D011_001STRATEGICSITESDisplays key strategic sites in <strong>Wigan</strong>.Set L - <strong>Flood</strong>Velocity Map2009s0578 - D012_001FLOODVELOCITY MAPDisplays strategic flood velocities during a 1% AEP storm event obtained fromJFLOW+.Set M - CanalBreach VelocityGrids2009s0578 - D013_001CANALBREACHVELOCITYGRIDIndicates potential breach failure velocity rates of canal pounds along the LeedsLiverpool Canal through the <strong>Wigan</strong> borough. "Canal Hazard Zones" have beengenerated for areas which could flood if the Leeds and Liverpool canal were to overtopor breach. These hazard zones should influence the spatial placement ofdevelopment during the Sequential Test and highlight the need for FRA to investigatethe residual risk further during a site-specific FRA. It is recommended that detailedinvestigations should be carried out and results incorporated into the final designfinished floor levels of the development. Site emergency plans should also take theresidual risk into account.Set M - CanalBreach VelocityGrids2009s0578 - D013_002CANALBREACHVELOCITYIndicates potential breach failure velocity rates of canal pounds along the LeedsLiverpool Canal through the <strong>Wigan</strong> borough. "Canal Hazard Zones" have beengenerated for areas which could flood if the Leeds and Liverpool canal were to overtop2009s0578 Final SFRA with Environment Agency Comments - L2 Ver5 <strong>Wigan</strong>.docXII

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!