- Page 1 and 2: Wigan Borough Hybrid SFRAVolume I:
- Page 3 and 4: JBA OfficeJBA ConsultingSouth BarnB
- Page 5 and 6: AcknowledgmentsJBA would like to ac
- Page 7 and 8: Understanding flood risk from a pla
- Page 9 and 10: 8.3 Planning considerations........
- Page 11 and 12: AbbreviationsABDAreas Benefiting fr
- Page 13 and 14: The key objectives of a SFRA are to
- Page 15 and 16: 2 Flooding from RiversA detailed as
- Page 17: 1. Astely Brook2. Bedford Brook3. W
- Page 21 and 22: 2.7 Understanding flood risk from a
- Page 23 and 24: For example, flooding may affect ke
- Page 25 and 26: 3 Flooding from CanalsThe SFRA has
- Page 27 and 28: 3.2.2 Canal breach methodologyCanal
- Page 29 and 30: 4 Flooding from ReservoirsFollowing
- Page 31 and 32: direction in Future Water3, Making
- Page 33 and 34: oundaries. Nine key CDAs have been
- Page 35 and 36: CDA Sites Site TypeLark Hill, Astle
- Page 37 and 38: particular hotspots where surface w
- Page 39 and 40: important role to play in reducing
- Page 41 and 42: In the reverse situation, where flo
- Page 43 and 44: 8 Summary of riskA summary of flood
- Page 45 and 46: Having followed this procedure it i
- Page 47 and 48: 9 Outline Mitigation OptionsChapter
- Page 49 and 50: Water-resistant materials for floor
- Page 51 and 52: JBA Consulting - Engineers Scientis
- Page 53 and 54: JBA Consulting - Engineers Scientis
- Page 55 and 56: Table B-1: Flood Risk Balance Sheet
- Page 57 and 58: Map Name Map Reference Map Title De
- Page 59 and 60: Map Name Map Reference Map Title De
- Page 61 and 62: Map Name Map Reference Map Title De
- Page 63 and 64: Map Name Map Reference Map Title De
- Page 65 and 66: Map Name Map Reference Map Title De
- Page 67 and 68: Map Name Map Reference Map Title De
- Page 69 and 70:
Map Name Map Reference Map Title De
- Page 71 and 72:
Map Name Map Reference Map Title De
- Page 73 and 74:
Map Name Map Reference Map Title De
- Page 75 and 76:
Map Name Map Reference Map Title De
- Page 77 and 78:
Map Name Map Reference Map Title De
- Page 79 and 80:
Map Name Map Reference Map Title De
- Page 81 and 82:
D . Wigan Council - Data RegisterXX
- Page 83 and 84:
E . SUDs SuitabilityNew SiteReferen
- Page 85 and 86:
New SiteReferenceWig 354Site Addres
- Page 87 and 88:
New SiteReferenceWig 855Wig 857Wig
- Page 89 and 90:
New SiteReferenceWig 728Wig 824Wig
- Page 91 and 92:
New SiteReferenceWig 716Wig 706BSit
- Page 93 and 94:
New SiteReferenceWig 738Wig 740Wig
- Page 95 and 96:
New SiteReferenceWig 162Wig 676Wig
- Page 97 and 98:
Site Reference Site Location Soil T
- Page 99 and 100:
F . Flood Zone 3 Proposed Developme
- Page 101 and 102:
G . Environment Agency comments on
- Page 103 and 104:
Flood Hazard MappingThe Level 2 rep
- Page 105 and 106:
Planning LiaisonEnvironment Agency
- Page 107 and 108:
Guide makes further summation diffi
- Page 109 and 110:
Wigan Metropolitan Borough CouncilC
- Page 111 and 112:
of the extent of any works required
- Page 113 and 114:
Planning & Transport StrategyWigan
- Page 115 and 116:
Again, avoiding generalities, we ha
- Page 117 and 118:
EA comment:Guidance on the preparat
- Page 119 and 120:
Please give me a call to discuss wh
- Page 121 and 122:
RECORD OF MEETINGStatus:JBA Project