- Page 1 and 2:
Wigan Borough Hybrid SFRAVolume I:
- Page 3 and 4:
JBA OfficeJBA ConsultingSouth BarnB
- Page 5 and 6:
AcknowledgmentsJBA would like to ac
- Page 7 and 8:
Understanding flood risk from a pla
- Page 9 and 10:
8.3 Planning considerations........
- Page 11 and 12:
AbbreviationsABDAreas Benefiting fr
- Page 13 and 14:
The key objectives of a SFRA are to
- Page 15 and 16:
2 Flooding from RiversA detailed as
- Page 17 and 18:
1. Astely Brook2. Bedford Brook3. W
- Page 19 and 20:
Unique ID Watercourse Description L
- Page 21 and 22:
2.7 Understanding flood risk from a
- Page 23 and 24:
For example, flooding may affect ke
- Page 25 and 26:
3 Flooding from CanalsThe SFRA has
- Page 27 and 28:
3.2.2 Canal breach methodologyCanal
- Page 29 and 30:
4 Flooding from ReservoirsFollowing
- Page 31 and 32:
direction in Future Water3, Making
- Page 33 and 34:
oundaries. Nine key CDAs have been
- Page 35 and 36:
CDA Sites Site TypeLark Hill, Astle
- Page 37 and 38:
particular hotspots where surface w
- Page 39 and 40:
important role to play in reducing
- Page 41 and 42:
In the reverse situation, where flo
- Page 43 and 44:
8 Summary of riskA summary of flood
- Page 45 and 46:
Having followed this procedure it i
- Page 47 and 48:
9 Outline Mitigation OptionsChapter
- Page 49 and 50:
Water-resistant materials for floor
- Page 51 and 52:
JBA Consulting - Engineers Scientis
- Page 53 and 54:
JBA Consulting - Engineers Scientis
- Page 55 and 56:
Table B-1: Flood Risk Balance Sheet
- Page 57 and 58:
Map Name Map Reference Map Title De
- Page 59 and 60:
Map Name Map Reference Map Title De
- Page 61 and 62:
Map Name Map Reference Map Title De
- Page 63 and 64:
Map Name Map Reference Map Title De
- Page 65 and 66:
Map Name Map Reference Map Title De
- Page 67 and 68:
Map Name Map Reference Map Title De
- Page 69 and 70:
Map Name Map Reference Map Title De
- Page 71 and 72: Map Name Map Reference Map Title De
- Page 73 and 74: Map Name Map Reference Map Title De
- Page 75 and 76: Map Name Map Reference Map Title De
- Page 77 and 78: Map Name Map Reference Map Title De
- Page 79 and 80: Map Name Map Reference Map Title De
- Page 81 and 82: D . Wigan Council - Data RegisterXX
- Page 83 and 84: E . SUDs SuitabilityNew SiteReferen
- Page 85 and 86: New SiteReferenceWig 354Site Addres
- Page 87 and 88: New SiteReferenceWig 855Wig 857Wig
- Page 89 and 90: New SiteReferenceWig 728Wig 824Wig
- Page 91 and 92: New SiteReferenceWig 716Wig 706BSit
- Page 93 and 94: New SiteReferenceWig 738Wig 740Wig
- Page 95 and 96: New SiteReferenceWig 162Wig 676Wig
- Page 97 and 98: Site Reference Site Location Soil T
- Page 99 and 100: F . Flood Zone 3 Proposed Developme
- Page 101 and 102: G . Environment Agency comments on
- Page 103 and 104: Flood Hazard MappingThe Level 2 rep
- Page 105 and 106: Planning LiaisonEnvironment Agency
- Page 107 and 108: Guide makes further summation diffi
- Page 109 and 110: Wigan Metropolitan Borough CouncilC
- Page 111 and 112: of the extent of any works required
- Page 113 and 114: Planning & Transport StrategyWigan
- Page 115 and 116: Again, avoiding generalities, we ha
- Page 117 and 118: EA comment:Guidance on the preparat
- Page 119 and 120: Please give me a call to discuss wh
- Page 121: RECORD OF MEETINGStatus:JBA Project