- Page 1 and 2:
Bever Team 3User Manual
- Page 3 and 4:
Bever Team 3Content1 What is Bever
- Page 5 and 6:
Bever Team 34.9.2 Injection paramet
- Page 7 and 8:
Bever Team 3Bever Team 3 Main1 What
- Page 9 and 10:
Bever Team 34 Main screenFig. 2Main
- Page 11 and 12:
Bever Team 3Fig. 5Data base connect
- Page 13 and 14:
Bever Team 3Fig. 8Find the project
- Page 15 and 16:
Bever Team 3When an already existin
- Page 17 and 18:
Bever Team 31.1 Submit to databaseT
- Page 19 and 20:
Bever Team 31.5.3 Contour LayersHer
- Page 21 and 22:
Bever Team 32 The ScreenThe screen
- Page 23 and 24:
Bever Team 3Fig. 23The next step wi
- Page 25 and 26:
Bever Team 35 Sheet - TunnelsA tunn
- Page 27 and 28:
Bever Team 38 Sheet - VerticalThe v
- Page 29 and 30:
Bever Team 3Fig. 34There are severa
- Page 31 and 32:
Bever Team 3Production Planning1 Ov
- Page 33 and 34:
Bever Team 3If the Alarm is set, th
- Page 35 and 36:
Bever Team 3Drill plan editorFig. 4
- Page 37 and 38:
Bever Team 31.2 Create holes on a l
- Page 39 and 40:
1.4 Read hole groupFig. 48Choose Op
- Page 41 and 42:
1.6 Sequence and rotationFig. 50Cho
- Page 43 and 44:
1.8 Operations in the tableTable:Fi
- Page 45 and 46:
1.10 Ignitor GroupsFig. 56Choose me
- Page 47 and 48:
As built geometry1 OverviewThe as b
- Page 49 and 50:
Fig. 603 Profile log viewerThe main
- Page 51 and 52:
Toggle deviation: Will set the devi
- Page 53 and 54:
3.1.1 SettingsFig. 66To change valu
- Page 55 and 56:
deviation and use that value where
- Page 57 and 58:
Fig. 70 shows the last sheet where
- Page 59 and 60:
Trench volume - The operator must d
- Page 61 and 62:
- .TL2 Bever Production log files-
- Page 63 and 64:
2.1.2 Round ReportA report where va
- Page 65 and 66:
3 TunnProduction3.1 Main ScreenFig.
- Page 67 and 68: • Tool bar• Status bar• Page
- Page 69 and 70: Hole depth• Depth ref: Max, colla
- Page 71 and 72: 3.4.4 Multi holeFig. 82 Multi holeG
- Page 73 and 74: 3.4.6 Drillpattern 3DFig. 84 Drillp
- Page 75 and 76: 3.4.8 Collar surfaceFig. 86 Collar
- Page 77 and 78: Fig. 88 PropertiesGeneral• Peg li
- Page 79 and 80: 3.6 Miscellaneous3.6.1 SequenceChoo
- Page 81 and 82: Injection4 Start InjectionFig. 93 S
- Page 83 and 84: 4.4 Summing upFig. 96 Summing up re
- Page 85 and 86: 4.6 RecipesFig. 98 Recipe reportThe
- Page 87 and 88: 4.8 Diagram Flow PressureFig. 100 D
- Page 89 and 90: 4.9.2.1 Injection Amount and Pressu
- Page 91 and 92: 4.9.4 Drill plan view ColumnFig. 10
- Page 93 and 94: 4.11.2 Setting cement parametersFig
- Page 95 and 96: 4.11.6 Setting GeneralFig. 112 Sett
- Page 97 and 98: 4.12.4 AmountFig. 116 AmountFor the
- Page 99 and 100: Also existing drill information can
- Page 101 and 102: 4.15.2 RecipesFig. 123 RecipesA rec
- Page 103 and 104: Bever Team 3MWDThe Bever Control MW
- Page 105 and 106: Bever Team 3Right click with the mo
- Page 107 and 108: Bever Team 3endsremoval of the nois
- Page 109 and 110: Bever Team 3All the desired hole ty
- Page 111 and 112: Bever Team 3It is very important th
- Page 113 and 114: Bever Team 31-08 Hole diameter Hole
- Page 115 and 116: Bever Team 3Penetration rate is the
- Page 117: Bever Team 3Injection drilling 20 m