31.07.2015 Views

PROCUREMENT GUIDELINES - Ministry of Finance and Planning

PROCUREMENT GUIDELINES - Ministry of Finance and Planning

PROCUREMENT GUIDELINES - Ministry of Finance and Planning

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

54GOVERNMENT <strong>PROCUREMENT</strong> <strong>GUIDELINES</strong>such items/perform the Works/provide the Services as per thequoted rates, for such purposes the bidder may be asked toprovide a rate analysis.(b) If the TEC is <strong>of</strong> the view that the justification/explanation providedby the bidder is unacceptable, <strong>and</strong> hence the bidder would fail inthe performance <strong>of</strong> his obligations within the quoted rates, suchBid may be rejected.(c) If the justification/explanation <strong>of</strong> the bidder is acceptable, theTEC should proceed with the evaluation.(d) If the TEC continues to entertain some doubt about thecontractor’s/supplier’s ability to procure such items/perform theWorks/provide the Services as per the quoted rates despiteexplanation/justification provided, a higher performance securitymay be requested to mitigate such risks.(e) If the bidder refuses to provide such additional performancesecurity, his Bid shall be rejected.The details <strong>of</strong>postqualificationare given inProcurementManual 7.10.17.10 Post Qualification7.10.1 (a) Post-qualification <strong>of</strong> bidders serves as a safety measure to ensurethat the lowest evaluated bid has been submitted by a responsible<strong>and</strong> trustworthy bidder.(b) Prior to the award <strong>of</strong> contract, it is necessary to determine thatthe bidder who has submitted the lowest evaluated bid has therequired capacity <strong>and</strong> resources to carry out the contracteffectively.7.10.2 Even if pre-qualification was done, if there is a considerable timefrom the date <strong>of</strong> pre-qualification up to the time bids were invited, itmay be necessary to update the information furnished with the prequalificationapplication to ascertain whether there are materialchanges.7.10.3 A bidder not complying substantially with the post-qualification criteriadisclosed in the bidding document may be rejected at this stage. Ifso, post-qualification is carried out with the next lowest evaluatedbidder.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!