4.1.3 Wind Turbine electrical coupled to a RO plant, AEROGEDESA ® Project, Gran<br />

Canaria<br />

a. Introduction<br />

The plant has been installed in Pozo Izquierdo, Gran Canaria Island. The plant<br />

commissioned in 2003, started its operation at the end of 2004 and is still in<br />

operation. The project has been financed by the Government of the Canary Islands<br />

(FEDER) and has been carried out by Instituto Tecnologico de Canarias, ITC. The<br />

scope of the project was the electrical coupling of a commercial wind turbine to a RO<br />

unit <strong>for</strong> seawater desalination, operating under a constant regime and managing the<br />

storage and available wind energy use through minimum battery bank. The battery<br />

bank mainly guarantees that the washing system is filled with fresh water, providing<br />

a longer working life of the membranes. The whole system is fully automatic. The<br />

wind speed at the area is ranged from 4.5 to 13 m/s.<br />

b. System Description<br />

The system consists of a 15 kW Wind turbine (by VERGNET, France), a 190 Ah lead<br />

acid battery bank, an inverter and a 0.80 m 3 /hr Reverse Osmosis unit (by Tecnologia<br />

Canaria del Aqua and ITC). The RO unit consists of 2 pressure vessels in series with<br />

2 membranes each (SW30-4040). The salinity of the feed water is 35.500 ppm TDS.<br />

The produced water has a salinity of less than 500 ppm TDS. The nominal pressure<br />

of operation of the RO unit is 55 bar and the recovery ratio is of 37%. The highpressure<br />

pump, which is the main load of the RO unit, is 7.5 kW. The pump motor is<br />

a three-phase motor. The energy consumed by the RO unit is 7 kWh/m 3 . The<br />

pretreatment system consists only of filtration (sand filter and cartridge filter). No<br />

chemical addition. A fresh water storage tank of 250m 3 is also available.<br />

The hours of RO‘s operation depend on the availability of the wind, which are in<br />

winter: 15 hr/day in average and in summer: 20 hr/day in average.<br />

The power supply system consists of a wind turbine with a rated power of 15 kW, a<br />

three-phase self exciting induction generator <strong>for</strong> a static condenser battery, a<br />

charger and a three-phase sine-wave inverter, both micro-processed. It also has<br />

battery storage with autonomy of more than 1 hour.<br />

The RO unit adapted to a frequent start/stop configuration coupled to the system. It<br />

is an electric coupling from a commercial wind turbine of 15 kW to RO unit, operating<br />

WP2 <strong>ADU</strong>-<strong>RES</strong> 27