Pic. 6 The RO unit in Fuerteventura<br />

- Public street lights with an average consumption of 44kWh/day and the domestic<br />

consumption of the inhabitants of the village of 5000 kWh/month<br />

- Sewage treatment plant with an average consumption of 96 kWh/day in summer<br />

and 24kWh/day <strong>for</strong> the rest months of the year<br />

- Winch to haul boats in from the sea with an average power consumption of 250<br />

kWh/month<br />

- Binary dump loads consisting of resistance blocks from 390 to 50 kW<br />

The control system consists of an industrial PC, the monitor of which permits, via<br />

specially developed software, the visualization in real time of the system in operation<br />

and the storage of data at an average rate of 300 7 s. Figure 10 shows the block<br />

diagram of all the devices controlled by the central control system (CCS). In addition<br />

to that, there are local control systems (LCS) in the wind and diesel generators, the<br />

hydro-compressor, the sewage plant, the freezer and the desalination plant.<br />

The wind diesel system was designed <strong>for</strong> operation in the following three modes:<br />

a. operation only of the diesel generator: occurs when the wind-driven generator<br />

is out of service, either because of lack of wind or other causes<br />

b. operation of the wind and diesel: occurs during those periods where the wind<br />

is not sufficient <strong>for</strong> the wind-driven generator alone to supply the required<br />

active power<br />

c. operation of only wind generator: occurs when sufficient wind is available.<br />

This mode is the only in which the desalination plant and the dump loads<br />

which stabilize the system are connected.<br />

WP2 <strong>ADU</strong>-<strong>RES</strong> 33