10<br />
Reliable emergency lighting requires<br />
a well thought concept.<br />
Engineering projects always create the same<br />
questions on installation, cost efficiency<br />
and connection to building management<br />
systems coming to the emergency<br />
lighting design. INOTEC Sicherheitstechnik<br />
offers experience, know-how and<br />
outstanding technical products.<br />
To produce light and illuminate all exit<br />
paths sufficiently - these are the main<br />
features for emergency lighting<br />
systems in case of a mains fail<br />
condition or in an emergency<br />
situation. The building owner has to<br />
make certain, that these functions are<br />
perfectly working - even after years.<br />
Regular tests, maintenance and service<br />
are one backbone to ensure reliable<br />
function of all emergency lighting<br />
system components.<br />
Inline with national standards regulare<br />
visual checks, functiontests and system<br />
duration tests have to be performed.<br />
Test data and all relevant system<br />
information must be kept in a<br />
log-book.<br />
Lamps must be replaced and new<br />
batteries have to be installed.<br />
This can create, depending on the<br />
building size and the installed system,<br />
quite substantial costs. The long-term<br />
spending sometimes outrun the initial<br />
costs by a long way. This should be<br />
considered to find the most favourable<br />
solution when starting the project<br />
engineering.<br />
Batt.-Operation<br />
Operation<br />
Failure<br />
1 2 3 4 5 6 FS 24V RTG B SL<br />
To limit the expected costs and freeze<br />
the safety level at the highest point we<br />
use the INOTEC <strong>SV</strong>-monitoring system.<br />
Batt.-Operation<br />
Failure<br />
Charging failure<br />
Remote Control<br />
Emergency lighting systems and<br />
connected components bearing this<br />
prefix test and monitor themselves.<br />
The results can be displayed, printed or<br />
Operation<br />
stored.<br />
Menue<br />
Enter<br />
Change<br />
Test<br />
Luminaries+<br />
Em-light system<br />
kwh<br />
Visual test<br />
Routine<br />
test<br />
+ -<br />
Lamps<br />
Battery<br />
+ -<br />
CH1 CH2 CH3 CH4<br />
L N L N L N L N<br />
Maintenance<br />
Light Switch<br />
Indicator<br />
+ -<br />
3,15 AT<br />
<strong>ELS</strong> - <strong>SV</strong><br />
Advantages of monitored emergency lighting systems<br />
FT<br />
DT<br />
Investscosts<br />
Energy costs<br />
Labour costs<br />
visual check<br />
Labour costs<br />
FT/DT<br />
Material costs<br />
3,15 AT<br />
Labour costs<br />
for testing<br />
.<br />
230V / AC<br />
output<br />
50 / 60 Hz 1<br />
PE N L Maintenance NLPE<br />
2<br />
NLPE<br />
3<br />
NLPE<br />
4<br />
NLPE<br />
Labour costs<br />
costs<br />
3,15 AT<br />
3,15 AT<br />
Operation<br />
costs<br />
3,15 AT<br />
Lighting<br />
system<br />
costs