C<strong>on</strong>structi<strong>on</strong> of water supply system in <strong>the</strong> <strong>occupied</strong> Shusha district<br />

│Photo from www.himnadram.org │ 2013<br />

In September 2014, ArmWaterProject Company’s director, Yuri Javadyan, travelled to <strong>the</strong><br />

<strong>occupied</strong> <strong>territories</strong> to meet with A.Harutyunyan and to present a project of <strong>the</strong> Sarsang water<br />

reservoir’s water usage for irrigati<strong>on</strong> of some 18,000 hectares of agricultural lands. 389 To note,<br />

before <strong>the</strong> occupati<strong>on</strong>, <strong>the</strong> water from that reservoir with <strong>the</strong> capacity of 560 thousand m³ was<br />

used to irrigate some 80,1 thousands hectares in <strong>the</strong> downstream Tartar, Aghdam, Barda and<br />

Goranboy districts of Azerbaijan.<br />

Hayastan All-Armenian Fund financed full<br />

rec<strong>on</strong>structi<strong>on</strong> of <strong>the</strong> water supply system of<br />

<strong>the</strong> town of Lachyn. Within that project, new<br />

pumps were installed in each of <strong>the</strong> six wells,<br />

<strong>the</strong> pumping stati<strong>on</strong> was equipped with new<br />

and modern equipment and 1115m l<strong>on</strong>g water<br />

main pipeline was rec<strong>on</strong>structed. The project<br />

also included <strong>the</strong> rehabilitati<strong>on</strong> of <strong>the</strong> daily<br />

regulati<strong>on</strong> reservoirs and <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> of<br />

a nearly 27km l<strong>on</strong>g new internal distributi<strong>on</strong><br />

network. The project was completed in 2011.<br />

Within <strong>the</strong> Hayastan All-Armenian Fund’s<br />

“Shushi” development initiative, <strong>the</strong> water<br />

supply system in <strong>the</strong> <strong>occupied</strong> town of Shusha<br />

A Swiss businessman Vartan Sirmakes (centre) visits <strong>the</strong><br />

c<strong>on</strong>structi<strong>on</strong> site of <strong>the</strong> new water reservoir in <strong>the</strong> <strong>occupied</strong> Lachyn<br />

district<br />

│Photo from www.tert.am│23 July 2015<br />

was c<strong>on</strong>structed. That included <strong>the</strong> rehabilitati<strong>on</strong> of <strong>the</strong> water purificati<strong>on</strong> stati<strong>on</strong>, <strong>the</strong> daily<br />

regulati<strong>on</strong> reservoirs, as well as <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> of a new reservoir and distributi<strong>on</strong> network that<br />

covered all <strong>the</strong> districts of <strong>the</strong> town of Shusha. The project was completed in 2012. 390<br />

In July 2015, CEO of <strong>the</strong> “M.Energo-L CJSC” Alexander Mamounts informed that, at <strong>the</strong> initiative<br />

and investment of a Swiss businessman Vartan Sirmakes, a new water reservoir is being built<br />

at <strong>the</strong> intersecti<strong>on</strong> of <strong>the</strong> Hakari and Zabukhchay rivers in <strong>the</strong> <strong>occupied</strong> Lachyn district. The<br />

reservoir’s project was designed by <strong>the</strong> ArmWaterProject Company Ltd., which designed<br />

Armenia’s all major irrigati<strong>on</strong> systems. 391 It is expected to be <strong>the</strong> sec<strong>on</strong>d largest reservoir in <strong>the</strong><br />

<strong>occupied</strong> <strong>territories</strong>, after <strong>the</strong> Sarsang Reservoir, and will store some 12 milli<strong>on</strong> m³ of water. The<br />

project envisages <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> of <strong>on</strong>e of <strong>the</strong> largest am<strong>on</strong>g <strong>the</strong> small hydro power plants built<br />

in <strong>the</strong> <strong>occupied</strong> <strong>territories</strong> with power generati<strong>on</strong> capacity of 30 milli<strong>on</strong> kW/h. 392 C<strong>on</strong>structi<strong>on</strong><br />

works are expected to be completed in two years. Exploitati<strong>on</strong> of <strong>the</strong> reservoir is aimed at<br />

expanding <strong>the</strong> irrigati<strong>on</strong> system in those <strong>territories</strong>. The reservoir will also be used for building<br />

fish breeding enterprise. 393<br />

389<br />

See “The Prime Minister discussed prospects of Talish’s development”, Artsakhpress.am, 30 May 2014, .<br />

390<br />

See .<br />

391<br />

See .<br />

392<br />

See “Swiss-Armenian businessman will fund <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> of a large dam in Artsakh”, 1tv.am, 24 July 2015, .<br />

393<br />

See “A new water reservoir being built in Kashatagh”, Artsakhpress.am, 28 July 2015, ;<br />

“Nagorno-Karabakh president visits Kashatagh regi<strong>on</strong>”, Tert.am, 23 July 2015,<br />

.<br />

64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!