26.04.2016 Views

AMERICA’S ARMY WINNING IN A COMPLEX WORLD

431298

431298

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ACAT III<br />

Force Protection Systems<br />

JPEO for Chemical and Biological Defense | Aberdeen Proving Ground, MD<br />

WARFIGHT<strong>IN</strong>G<br />

FUNCTION<br />

Mission Command<br />

Movement and Maneuver<br />

Intelligence<br />

Fires<br />

Sustainment<br />

Maneuver Support<br />

and Protection<br />

Engagement<br />

ACQUISITION<br />

LIFECYCLE PHASE<br />

Materiel Solution Analysis<br />

Technology Maturation &<br />

Risk Reduction<br />

Engineering & Manufacturing<br />

Development<br />

Production & Deployment<br />

Operations & Support<br />

MILESTONE DECISION<br />

AUTHORITY<br />

Defense Acquisition Executive<br />

Army Acquisition Executive<br />

Program Executive Officer<br />

DESCRIPTION<br />

Force Protection Systems consist of the following components:<br />

• Automated Installation Entry (AIE): AIE is a software and<br />

hardware system that provides enhanced security through credential<br />

verification and authentication, personnel vetting and establishing<br />

permissions for Army installation access.<br />

• Battlefield Anti-Intrusion System (BAIS): BAIS is a compact,<br />

modular, sensor-based warning system that can be used as a<br />

tactical stand-alone system for small units. It delivers early warning<br />

and situational awareness information based on proven, fielded,<br />

seismic and acoustic sensors and modified commercial off-the-shelf<br />

components; and classifies detections as personnel, vehicle, wheeled<br />

or tracked intrusions. BAIS provides a sizable increase in sensor<br />

density and depth to allow increased situational awareness.<br />

• The Lighting Kit, Motion Detector (LKMD): LKMD is a simple,<br />

compact, modular, sensor-based early warning system that provides<br />

programmable responses of illumination and sound.<br />

BENEFIT TO THE WARFIGHTER<br />

AIE improves guard force efficiency by automating access control<br />

processes for personnel entering an installation and by increasing accuracy<br />

of credential vetting. BAIS and LKMD provide early detection and<br />

warning by enhancing force effectiveness as well as increasing situational<br />

awareness for small tactical units and bases.<br />

SPECIFICATIONS<br />

• AIE:<br />

››<br />

System provides continuous vetting of credentials against federal<br />

data and interoperates with a defense enterprise capability to<br />

enable data sharing among Army installations, the Joint services<br />

and other agencies<br />

››<br />

Can immediately adapt to threat condition changes and employ<br />

applicable restrictive entrance criteria<br />

››<br />

Scalable architecture accommodates small, medium and large sites<br />

››<br />

Autonomously reads and verifies personnel credentials<br />

››<br />

Interfaces electronically with the Defense Enrollment Eligibility<br />

Reporting System<br />

• BAIS:<br />

››<br />

Consists of a hand-held monitor and three seismic/acoustic sensors<br />

››<br />

Provides coverage across a platoon’s defensive front (450 meters)<br />

• LKMD:<br />

››<br />

Modular, tactical ground sensor-based early warning system<br />

››<br />

Enhances unit awareness and force effectiveness during all<br />

types of operations and environments, including small-scale<br />

contingencies and Military Operations in Urban Terrain as well as<br />

high-intensity combat<br />

PROGRAM STATUS<br />

AIE:<br />

• FY13-FY15: Continued fielding and sustainment of existing systems<br />

BAIS:<br />

• 4QFY15: Production and fielding completed<br />

LKMD:<br />

• 2QFY13-4QFY15: Production completed<br />

PROJECTED ACTIVITIES<br />

AIE:<br />

• Through FY22: Continued fielding and sustainment planned<br />

BAIS:<br />

• FY16: Complete fielding; sustainment CECOM Logistics and<br />

Readiness Center (LRC)<br />

LKMD:<br />

• 1QFY16 - 2QFY16: Complete fielding; sustainment CECOM LRC<br />

begins in 1QFY16<br />

194<br />

UNITED STATES <strong>ARMY</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!