STAGE: Tender<br />

£25m - Mixed Use Development of Homes,<br />

Community Centre, Business Units<br />

Location:<br />

Former Visteon Factory, Blacks Road, Belfast, Co. Antrim, BT10<br />

A decision to grant planning permission was issued in January 2016 to Fold<br />

<strong>Housing</strong> Association in regard to its plan to redevelop the former Visteon factory<br />

site in west Belfast.<br />

A revised planning application was submitted by Fold <strong>Housing</strong> Association<br />

significantly increasing business use space. Fold <strong>Housing</strong> had been told that the<br />

scheme did not include enough new space for economic or business use. The<br />

Association wants to build 244 homes, a community centre and business units on<br />

the site.<br />

The overall project will take 3 years to complete at a cost in the region of £25<br />

million. Fold purchased the former Visteon site in June 2013. Since then Fold<br />

has undertaken considerable work to prepare the site for development,<br />

including the demolition of several derelict factory buildings.<br />

Original plans for the major redevelopment included the demolition of the<br />

existing buildings and the construction of a comprehensive mixed-use<br />

development. The plans show housing designed around a series of 'village<br />

greens' - in total 244 social and private/affordable residential units with the<br />

associated public open space/linear park areas. The non-residential element of<br />

the project is to include a community centre and Class B business units (Class<br />

B1b/B1c/B2 uses) with associated car parking and access from Finaghy Road<br />

North.<br />

The Visteon factory closed in controversial circumstances in 2009 with the loss of<br />

more than 200 jobs. The factory site sits in a visually prominent site next to the<br />

M1 motorway, and is mostly demolished now.<br />

Fold <strong>Housing</strong> Association intend to appoint a contractor for the provision of<br />

works in respect of circa 196 units of social housing and circa 48 affordable<br />

housing units. The proposed works contract will involve decontamination of the<br />

soils including injection remediation to shallow soils and waters and monitoring<br />

of contaminants, multi phase handovers and the construction of 244 social and<br />

affordable housing units in an urban location.<br />

The scheme will contain the following mix of social housing units: 85 x 5p, 3b<br />

houses; 92 x 3p, 2b houses; 9 x 3p, 2b apartments; 1 x 4b wheelchair<br />

bungalow; 3 x 3b wheelchair bungalows; 4 x 2b wheelchair bungalows; 1 x 3b<br />

wheelchair house; 1 x 1b wheelchair apartment. The scheme will contain the<br />

following mix of affordable housing units: 36 x 5p, 3b houses; 12 x 3p, 2b<br />

apartments.<br />

Lisney has advertised part of the site for sale:<br />

• High profile commercial development opportunity<br />

• Prominent location adjacent to the M1 Motorway<br />

• Full planning permission for a commercial development comprising c. 6,075<br />

sq.m of business accommodation (Class B)<br />

The subject property occupies a prominent location adjacent to the M1<br />

Motorway, approximately 4.2 miles south west of Belfast City Centre. The<br />

subject lands form part of the former Visteon Factory site and will have access<br />

via Finaghy Road North on a prominent location adjacent to the M1 Motorway<br />

and wider Motorway network. The subject lands form part of a comprehensive<br />

regeneration scheme which will provide 244 no. social, private/affordable<br />

Construction Information Services (CIS) 70<br />

Northern Ireland <strong>Social</strong><br />

<strong>Housing</strong> <strong>Review</strong> 2016<br />

Co. Antrim<br />

Tender<br />

ProjectID 760719<br />

Value:<br />

Start Date:<br />

Finish Date:<br />

Duration:<br />

£<br />

PLANNING DETAILS<br />

Plan. Auth:<br />

Plan. Ref:<br />

Submitted:<br />

Decision:<br />

Dec. Date:<br />

Site Area:<br />

Units:<br />

TENDER INFO<br />

Tender Deadline:<br />

Ref:<br />

EU Ref:<br />

SPECIFICATIONS<br />

Walls<br />

Walls<br />

Walls<br />

Windows<br />

Windows<br />

Windows<br />

Doors<br />

25,000,000<br />

24-Oct-16<br />

21-Oct-19<br />

36 month(s)<br />

Belfast<br />

Z/2013/1434/F<br />

09-Dec-13<br />

Plans Granted<br />

08-Jan-16<br />

8.7 Hctrs<br />

244<br />

30-Nov-15<br />

FOLD VISTEON<br />

2014/S 162-2<br />

Render<br />

Brick Wall<br />

Stone Wall<br />

uPVC Windows<br />

Double Glazed Windows<br />

Aluminium Framed<br />

Windows<br />

Timber Doors