04.06.2016 Views

WATECO - 2003 - Common implementation strategy for the Water Frame

WATECO - 2003 - Common implementation strategy for the Water Frame

WATECO - 2003 - Common implementation strategy for the Water Frame

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WFD <strong>Common</strong> Implementation Strategy – Progress and Work Programme <strong>2003</strong>/2004<br />

___________________________________________________________________________________<br />

• Overall timetable<br />

Tasks<br />

1. Guidance <strong>for</strong> reporting under <strong>the</strong> WFD<br />

2. Assessment of State of Environment<br />

3. In<strong>for</strong>mation <strong>for</strong> International organisations<br />

4. Assessment of Policy Effectiveness<br />

5. In<strong>for</strong>mation <strong>for</strong> <strong>the</strong> Public<br />

<strong>2003</strong> 2004 2005 2006<br />

• Lead countries/body<br />

The Commission / DG ENV will be <strong>the</strong> leader of WG 2.D. It will be assisted by a<br />

European Steering Team involving <strong>the</strong> following bodies: COM / JRC, COM /<br />

EUROSTAT, EEA<br />

• Participants<br />

In addition <strong>the</strong> Steering Team, all Member States, o<strong>the</strong>r countries in <strong>the</strong> CIS,<br />

stakeholders and NGOs can nominate experts to this group through <strong>the</strong>ir<br />

representative in <strong>the</strong> Strategic Coordination Group.<br />

• Links with o<strong>the</strong>r activities<br />

The WG has to take into account <strong>the</strong> ongoing activities on <strong>the</strong> revision of <strong>the</strong><br />

“Reporting Directive” (91/692/EEC) as well as under <strong>the</strong> INSPIRE initiative.<br />

• Type and intensity of work<br />

In its work, <strong>the</strong> WG will be supported by topic drafting teams responsible <strong>for</strong><br />

preparing working documents and preliminary guidelines to be discussed and<br />

agreed.<br />

The WG and <strong>the</strong> topic drafting teams will have to deal with a wide range of technical<br />

issues (data exchange procedures, geographical in<strong>for</strong>mation systems, web based<br />

applications etc…).<br />

It will also need to maintain close interactions with o<strong>the</strong>r WGs to address <strong>the</strong><br />

reporting aspects resulting from <strong>the</strong>ir work in an appropriate way.<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!