28.12.2016 Views

v18

Contract Bussiness

Contract Bussiness

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

will be supplied with desalinated water<br />

from 17 iconic concrete water towers.<br />

Marzouq said: “We have master<br />

planned this project so that it works<br />

with the nature, we have embraced its<br />

requirements and it has paid off, with<br />

a thriving marine eco-system.”<br />

Development will take place in<br />

10 phases, and over 25 years. Sea<br />

City, engineered by British experts,<br />

is under construction with huge<br />

channels already been dug.<br />

Ian Williams, La’ala’s project director,<br />

said that he could not give a cost for<br />

the whole project, but said it was<br />

“multi-billion dollar” project. “With<br />

the traffic congestion in the city,<br />

people will be attracted to make Sabah<br />

Al Ahmad Sea City their primary<br />

residence,” Williams said. “We<br />

have not tried to construct a dream<br />

around an iconic shape or symbol, as<br />

elsewhere in the region, we have used<br />

sound engineering and science to<br />

deliver a urban development that will<br />

stand the test of time.”<br />

One of the most extraordinary<br />

elements of the project is the way the<br />

sea has been brought almost six miles<br />

(9km) inland from the Persian Gulf.<br />

75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!