RPC Tüfentobel Extension Phase 3.1<br />

Entsorgung St. Gallen<br />

St. Gallen | Switzerland<br />

Mass flow 500 t/h<br />

Conveying length 1,168 m<br />

Vertical rise 45 m<br />

Belt speed 1.6 m/s<br />

Motor rating 112 kW<br />

Since 2005, a RopeCon ® system has been in use at the Tüfentobel<br />

waste tip to transport inert materials along an extensive stretch of valley<br />

that will subsequently be filled in and relandscaped. The conveyor<br />

belt is being successively extended so that it discharges the waste exactly<br />

where it is intended to go on the pile. Since the system first went<br />

into service, the discharge point has been relocated several times in<br />

order to minimize the distances covered by arriving garbage trucks<br />

as well as by the bulldozers used to distribute the waste material. In<br />

March 2016, a second RopeCon ® was incorporated directly within the<br />

rope span. Material transfer takes place at a height of roughly 20 m.<br />

The new RopeCon ® installation can be operated in both directions. As<br />

this second system uses the existing track ropes, it does not require<br />

its own support structure.