07.07.2017 Views

GineersNow Construction Leaders Magazine June 2017 Issue 003, Bechtel

GineersNow Construction Leaders Magazine Issue 003 Construction Leaders Magazine: Meet the 36-year-old Chairman and CEO of Bechtel, Brendan Bechtel Exclusive: KONE elevators and escalators, Wirtgen concrete paving, AXA insurance for construction projects, Scopus modular build project, KARAM safety products, Bitzer intelligent CSW compact screw compressor, DOKA formworks, scafolding and shoring for construction Special Feature Stories: BIM, Consultant, Contractor, Design, EPC, Finance, Heavy Equipment, Electro-mechanical, Machinery, Rental Equipment, HSE, EHS, Safety, Tools, Trucks, PMV, Construction, Civil Engineering, Mechanical, Electrical, Plumbing, MEP, EPC Country Focus: United States, Canada, United Arab Emirates, Saudi Arabia, Qatar, Bahrain, Kuwait, Oman, United Kingdom, Singapore, Hong Kong, Philippines, Malaysia, Indonesia, India, Australia, Turkey, China More engineering stories at https://www.gineersnow.com/topics/magazines

GineersNow Construction Leaders Magazine Issue 003

Construction Leaders Magazine: Meet the 36-year-old Chairman and CEO of Bechtel, Brendan Bechtel

Exclusive: KONE elevators and escalators, Wirtgen concrete paving, AXA insurance for construction projects, Scopus modular build project, KARAM safety products, Bitzer intelligent CSW compact screw compressor, DOKA formworks, scafolding and shoring for construction

Special Feature Stories: BIM, Consultant, Contractor, Design, EPC, Finance, Heavy Equipment, Electro-mechanical, Machinery, Rental Equipment, HSE, EHS, Safety, Tools, Trucks, PMV, Construction, Civil Engineering, Mechanical, Electrical, Plumbing, MEP, EPC

Country Focus: United States, Canada, United Arab Emirates, Saudi Arabia, Qatar, Bahrain, Kuwait, Oman, United Kingdom, Singapore, Hong Kong, Philippines, Malaysia, Indonesia, India, Australia, Turkey, China

More engineering stories at https://www.gineersnow.com/topics/magazines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HIMOINSA emergency power in just<br />

7 seconds for the Doha Festival City<br />

Doha Festival City, a world-class destination in<br />

Qatar celebrating the best in entertainment, retail<br />

and hospitality, has ensured the continuity of its<br />

power supply by installing generator sets that<br />

start up in record time in the event of a failure in<br />

the electricity grid.<br />

Occupying 670,000 square metres in the very<br />

heart of the Middle East, Doha Festival City will<br />

be home to more than 500 stores, including over<br />

100 restaurants, and a world-class entertainment<br />

complex, with both indoor and outdoor<br />

attractions unique to Qatar. This comprehensive<br />

mix of entertainment– from Qatar’s first VOX<br />

4D cinema complex with 18 digital screens, to<br />

four unique theme parks, including “Angry Birds<br />

World”, “Snow Dunes” - Qatar’s first indoor snow<br />

park, “Juniverse” – an edutainment park for<br />

children and “Virtuocity” which has been created<br />

exclusively for teens and adults.<br />

With footfall expected to exceed 1.6 million<br />

people per month, safety and the proper<br />

operation all business units at Doha Festival City<br />

will heavily rely on a system capable of supplying<br />

power in the event of an emergency. Not only<br />

that, such a system must meet the requirements<br />

that the Qatar Civil Defence has envisaged for<br />

public spaces.<br />

To feed such a huge complex and to respond<br />

quickly in the event of a power cut, HIMOINSA<br />

has supplied five generator sets, which each<br />

supply 1.736 kVA of stand-by energy. Thanks to<br />

a detailed programming study of its control units,<br />

and after having subjected the units to multiple<br />

highly demanding tests, HIMOINSA is able to<br />

guarantee a synchronised start-up in just seven<br />

seconds, which in fact exceeds the project’s<br />

technical specifications.<br />

Objective: To guarantee an uninterrupted supply<br />

of electricity with generator sets capable of<br />

starting up in synchronicity with 100% of the load<br />

and in less than 10 seconds in the event of a<br />

failure in the supply of electric power.<br />

Solution: Five HTW-1745 T5 generator sets<br />

that supply a total of 8.7MVA of stand-by power<br />

and respond seven seconds after any power<br />

failure. The units feature Mitsubishi engines and<br />

Stamford alternators that have been oversized<br />

and fitted with sophisticated control systems<br />

that synchronise the gensets. The gensets are<br />

also prepared to work in a maximum ambient<br />

temperature of 55 degrees centigrade.<br />

50 <strong>Construction</strong> <strong>Leaders</strong> • <strong>June</strong> <strong>2017</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!