CRT 48 Operation - Wacker Neuson
CRT 48 Operation - Wacker Neuson
CRT 48 Operation - Wacker Neuson
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Operation</strong> <strong>CRT</strong> <strong>48</strong><br />
2.3 New Machines<br />
See Graphic: wc_gr001252<br />
2.3.1 To break in the gearboxes, run the engine at 50% of full throttle for the<br />
first 2–4 hours. This will prevent premature wear and extend gear life.<br />
NOTICE: Running the engine at full throttle during the break-in period<br />
could result in premature gear failure.<br />
2.3.2 Verify that the horizontal blade pitch links are properly assembled.<br />
When seated on the machine, the right rotor should have an “R”<br />
designation located towards the upper portion of the pitch link and the<br />
left rotor should have an “L”.<br />
wc_tx000641gb.fm 22