14.12.2012 Views

CRT 48 Operation - Wacker Neuson

CRT 48 Operation - Wacker Neuson

CRT 48 Operation - Wacker Neuson

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Operation</strong> <strong>CRT</strong> <strong>48</strong><br />

2.3 New Machines<br />

See Graphic: wc_gr001252<br />

2.3.1 To break in the gearboxes, run the engine at 50% of full throttle for the<br />

first 2–4 hours. This will prevent premature wear and extend gear life.<br />

NOTICE: Running the engine at full throttle during the break-in period<br />

could result in premature gear failure.<br />

2.3.2 Verify that the horizontal blade pitch links are properly assembled.<br />

When seated on the machine, the right rotor should have an “R”<br />

designation located towards the upper portion of the pitch link and the<br />

left rotor should have an “L”.<br />

wc_tx000641gb.fm 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!