CRT 48 Operation - Wacker Neuson
CRT 48 Operation - Wacker Neuson
CRT 48 Operation - Wacker Neuson
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Operation</strong> <strong>CRT</strong> <strong>48</strong><br />
b<br />
2.10 Pitch Adjustment<br />
a<br />
wc_gr000147<br />
See Graphic: wc_gr000147<br />
When changing or setting the pitch (angle) of the trowel blades, slow<br />
the machine, set the desired pitch on the left side of the machine, then<br />
adjust the right side to match.<br />
To increase the pitch, turn the pitch control inward (a). Use the pitch<br />
indicator (b) to adjust pitch equally on both right and left trowel blades.<br />
25° 4<br />
3<br />
2<br />
0° 1<br />
5-10º<br />
wc_tx000641gb.fm 26<br />
15º<br />
20-25º<br />
Working Conditions of<br />
Concrete<br />
Suggested Working<br />
Pitch<br />
1. Wet surface working stage Flat (No Pitch)<br />
2. Wet to plastic working<br />
stage<br />
Slight Pitch<br />
3. Semi-hard working stage Additional Pitch<br />
4. Hard finishing stage<br />
(burnishing)<br />
Maximum Pitch