14.12.2012 Views

CRT 48 Operation - Wacker Neuson

CRT 48 Operation - Wacker Neuson

CRT 48 Operation - Wacker Neuson

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Operation</strong> <strong>CRT</strong> <strong>48</strong><br />

b<br />

2.10 Pitch Adjustment<br />

a<br />

wc_gr000147<br />

See Graphic: wc_gr000147<br />

When changing or setting the pitch (angle) of the trowel blades, slow<br />

the machine, set the desired pitch on the left side of the machine, then<br />

adjust the right side to match.<br />

To increase the pitch, turn the pitch control inward (a). Use the pitch<br />

indicator (b) to adjust pitch equally on both right and left trowel blades.<br />

25° 4<br />

3<br />

2<br />

0° 1<br />

5-10º<br />

wc_tx000641gb.fm 26<br />

15º<br />

20-25º<br />

Working Conditions of<br />

Concrete<br />

Suggested Working<br />

Pitch<br />

1. Wet surface working stage Flat (No Pitch)<br />

2. Wet to plastic working<br />

stage<br />

Slight Pitch<br />

3. Semi-hard working stage Additional Pitch<br />

4. Hard finishing stage<br />

(burnishing)<br />

Maximum Pitch

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!