CRT 48 Operation - Wacker Neuson
CRT 48 Operation - Wacker Neuson
CRT 48 Operation - Wacker Neuson
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Maintenance <strong>CRT</strong> <strong>48</strong><br />
3.10 Drive Belt<br />
See Graphic: wc_gr003775<br />
To replace the drive belt:<br />
3.10.1 Place the trowel on a flat, level surface with the blades pitched flat.<br />
3.10.2 Disconnect battery.<br />
3.10.3 Remove the beltguard.<br />
3.10.4 Remove the 3 bolts (a) holding the universal joint to the drive pulley.<br />
3.10.5 Remove the old belt and install a new one.<br />
3.10.6 Reverse the procedure for assembly. Align the bearings and shaft as<br />
straight as possible. Adjust pulley offset and center distance to values<br />
as shown.<br />
3.10.7 Torque the universal joint bolts (a) to 14 ±1,4 Nm (10±1 ft.lbs.).<br />
wc_tx000642gb.fm 34