14.12.2012 Views

West Bengal Panchayat (Zilla Parishad and Panchayat Samiti ...

West Bengal Panchayat (Zilla Parishad and Panchayat Samiti ...

West Bengal Panchayat (Zilla Parishad and Panchayat Samiti ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Key word : Records to be maintained by the Executive Engineer<br />

70.<br />

The Executive Engineer shall keep in safe custody, in his section the following documents with respect to<br />

his charge,<br />

Key word: Functions <strong>and</strong> duties of Sub-Assistant Engineer<br />

71.<br />

Subject to the supervision <strong>and</strong> control of the <strong>Panchayat</strong> <strong>Samiti</strong> through the Executive Officer, the<br />

Sub-Assistant Engineer of the <strong>Panchayat</strong> <strong>Samiti</strong>, shall be the officer-in-charge of all roads <strong>and</strong> buildings <strong>and</strong><br />

other Public Works, the control of which is vested in the <strong>Panchayat</strong> <strong>Samiti</strong>. When more than one<br />

Sub-Assistant Engineer is appointed or deputed to the <strong>Panchayat</strong> <strong>Samiti</strong> the work shall be distributed among<br />

the Sub-Assistant Engineers by the <strong>Panchayat</strong> <strong>Samiti</strong>. The Sub-Assistant Engineer(s) shall remain<br />

responsible to the Executive Officer <strong>and</strong> through him to the <strong>Panchayat</strong> <strong>Samiti</strong> <strong>and</strong> also for accuracy of all<br />

reports, plans, designs <strong>and</strong> specifications <strong>and</strong> estimates prepared by him <strong>and</strong> shall attest the same with the<br />

signature:<br />

Provided that no work shall be taken up by or, on behalf of the <strong>Panchayat</strong> <strong>Samiti</strong>, if such work is<br />

beyond the technical competence of the <strong>Panchayat</strong> <strong>Samiti</strong>.<br />

Key word: Maintenance of record by the Sub-Assistant Engineer<br />

72.<br />

The Sub-Assistant Engineer shall keep in his section the following documents with respect to his charge –<br />

(i) copies of all plans <strong>and</strong> estimates of buildings, roads, culverts under his charge<br />

with detailed drawing in each case showing the modifications thereon, if any,<br />

recording on it:<br />

(a) The name of the work,<br />

(b) The date of commencement of work,<br />

(c) The date of completion of work,<br />

(d) The estimated expenditure as well as actual expenditure incurred, <strong>and</strong><br />

(e) a certificate to the effect that the work has been executed as per approved<br />

drawing <strong>and</strong> estimate.<br />

While preparing the estimates for the schemes, the rules applicable for the<br />

<strong>Zilla</strong> <strong>Parishad</strong>, referred to in this chapter, shall be followed mutatis<br />

mut<strong>and</strong>is.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!