La Red de Alta Velocidad Europea: Más un mosaico poco efectivo que una realidad

El presente comunicado de prensa tiene por objeto ofrecer una síntesis del contenido esencial del informe especial del Tribunal de Cuentas Europeo. El texto íntegro del informe puede consultarse en www.eca.europa.eu.

El presente comunicado de prensa tiene por objeto ofrecer una síntesis del contenido esencial del informe especial del
Tribunal de Cuentas Europeo.
El texto íntegro del informe puede consultarse en www.eca.europa.eu.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21<br />

Table 2 - Assessment of time from planning to operation<br />

Audited high-speed rail<br />

lines and M<strong>un</strong>ich-Verona<br />

stretch<br />

Planning<br />

started<br />

Work<br />

started<br />

In operation*<br />

Years since<br />

planning<br />

Duration of<br />

work in<br />

years<br />

Berlin - M<strong>un</strong>ich 1991 1996 2017** 26 21<br />

Stuttgart - M<strong>un</strong>ich 1995 2010 2025* 30 15<br />

Rhin - Rhône 1992 2006 2011 19 5<br />

LGV Est Européenne 1992 2002 2016 24 14<br />

Madrid - Barcelona – 1988 1997 2013 25 16<br />

French Bor<strong>de</strong>r<br />

Eje Atlántico 1998 2001 2015 17 14<br />

Madrid - León 1998 2001 2015 17 14<br />

Madrid - Galicia 1998 2001 2019* 21 18<br />

Milan - Venice 1995 2003 2028* 33 25<br />

Turin - Salerno 1987 1994 2009 22 15<br />

M<strong>un</strong>ich - Verona 1986 2003 2040* 54 37<br />

* Expected.<br />

** 52 km not before 2018.<br />

Source: ECA.<br />

25. The TEN-T Regulation sets out the key infrastructure that Europe needs to build to<br />

support the EU’s sustainable mobility goals. It <strong>de</strong>scribes which transport investments are to<br />

be ready by 2030 (the core network), and which ones are to be ready by 2050 (the<br />

comprehensive network). To complete the core network, the Commission has estimated<br />

that 500 billion euro will be required, while 1.5 trillion euro is nee<strong>de</strong>d for the comprehensive<br />

network 20 .<br />

26. The Commission has no say in <strong>de</strong>cision-making, and it has no legal tools and no powers<br />

to hold Member States to their earlier commitments to build the high-speed lines nee<strong>de</strong>d to<br />

complete the core network. It also plays no role in <strong>de</strong>cisions on cross-bor<strong>de</strong>r links between<br />

20<br />

Source: <strong>Europea</strong>n Commission, “Delivering TEN-T Facts & figures”, September 2017, and Co<strong>un</strong>cil<br />

conclusions on the progress of the Trans-<strong>Europea</strong>n Transport Network (TEN-T) implementation<br />

and the Connecting Europe Facility for transport, 15425/17, 5 December 2017.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!