30.06.2018 Views

Tilt Technical Manual

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TILT-UP ENGINEERING GENERAL NOTES ©<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

The contractor must review plans and specifications in the <strong>Tilt</strong>-up Engineering General Notes and drawings to<br />

ensure that the panel dimensions are correct before casting any panels.<br />

<br />

<br />

<br />

<br />

<br />

<br />

“TOTAL REQD ERECTION REINFORCING” means: The total minimum reinforcing steel required to resist the erection<br />

stresses. <br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

THE CONCRETE MUST ATTAIN A MINIMUM COMPRESSIVE STRENGTH AND<br />

A MINIMUM MODULUS OF RUPTURE PRIOR TO THE PANELS BEING LIFTED.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

ATTAINING THE REQUIRED COMPRESSIVE STRENGTH DOES NOT NECESSARILY ENSURE THAT THE REQUIRED<br />

MODULUS OF RUPTURE HAS BEEN ATTAINED OR THAT THE CONCRETE TILT-UP PANELS CAN BE LIFTED WITHOUT<br />

CRACKING. <br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Meadow<br />

MEADOW<br />

BURKE<br />

Burke<br />

ENGINEERING Engineering<br />

3..1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!