30.06.2018 Views

Tilt Technical Manual

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Tilt</strong>-up <strong>Technical</strong> <strong>Manual</strong><br />

www.MeadowBurke.com<br />

Note: In order to convert 2 x 4 High Rigging to 2 x 2 High Rigging as<br />

shown above, the length of the Minor Slings used for the 2 x 2 High<br />

Converted Rigging must be greater than or equal to the minimum<br />

length required for the Major Slings when using 2 x 2 High Standard Rigging,<br />

as shown on page 43. See panel detail for the minimum sling length<br />

requirement.<br />

Panel Erection<br />

Note: If double insert lift hardware is not available for use with the<br />

double inserts cast in the panel, single lift units can be used to erect the<br />

panel by modifying the standard 2 x 2 High Rigging shownabove.<br />

To modify the rigging, add 4 additional pulleys and slings as shown above<br />

and connect to all 8 insert locations using 8 single insert lift units.<br />