81
Megaİzo PU 7 Polyurethane Based, Ready To Use, Elastic Waterproofing Material NEW PRODUCT DESCRIPTION Polyurethane based, lasting, elastic and ready to use waterproofing material with high water vapor permeability, which can be applied prior to the top coating material. AREAS OF USE Megaİzo PU 7 is applied for waterproofing before the top coating material in such wet spaces as bathrooms, kitchens and balconies, in terraces, in such surfaces that are constantly in contact with water, concrete shear surfaces, on tops of parking garages, on such surfaces that are not exposed to direct sunlight. It is suitable for use on horizontal and vertical surfaces of indoors and outdoors spaces. PRODUCT ADVANTAGES • 800% elastic. • Water vapor permeability. • Poses high crack bridging capability. • Preserves its mechanical properties within the temperature range between -30°C and +90°C. • Repaired rapidly and easily, locally. • Provides high strength against acidic and alkali solutions (10 %), detergents, seawater and oils. • Ensures seamless waterproofing for application surfaces. • Highly adhesive. • A ready to use product which is applied easily and rapidly. PERFORMANCE Expansion at breaking point %800 ± 80 ASTM D 412 Tensile strength 5.0±0.3 N/mm 2 ASTM D 412 Water vapor permeability 52.5±9 gr/m 2 /day ISO 9932:91 Water pressure resistance Leak-free (1 m water column, 24 hours) DIN EN 1928 Adhesion to concrete surface 2.2±0.2 N/mm 2 ASTM D 903 Hardness (shore A hardness) 65±5 ASTM D 2240 Flashing point B2 DIN 4102 - 1 The foregoing values represent the results of the laboratory tests conducted at 23 ± 2°C temperature and 50% ± 5 relative humidity conditions. The values provided as per the table may vary depending on the surface and ambient conditions. APPLICATION PROCEDURE Application Surfaces Indoors and Outdoors Walls; - Cement based plaster (MegaFilm İzo PU primer applied) - Concrete (MegaFilm İzo PU or MegaFilm İzo Epo primer applied) - Ceramic (MegaFilm İzo Epo primer applied) - Glass (MegaFilm İzo Epo primer applied) - Aluminum (MegaFilm İzo Epo primer applied) - Steel (MegaFilm İzo Epo primer applied) - Bituminous Felt (MegaFilm İzo Epo primer applied) Indoors and Outdoors Floors; - Cement based trowel coating (MegaFilm İzo PU primer applied) - Concrete (MegaFilm İzo PU or MegaFilm İzo Epo primer applied) - Ceramic (MegaFilm İzo Epo primer applied) - Glass (MegaFilm İzo Epo primer applied) - Aluminum (MegaFilm İzo Epo primer applied) - Steel (MegaFilm İzo Epo primer applied) - Bituminous Felt (MegaFilm İzo Epo primer applied) Surface Preparation • The application surface should be dry, clean, sound and dust free, and should have been cleansed of oil, dirt or any materials that may prevent adhesion, and any such materials as mortar and cement residues should be scraped from the application surface. • The humidity content of the surface should be 5 % at maximum. • The fresh concrete surface should be let dry for minimum 28 days before application. • The surface, on which Megaİzo PU 7 is to be applied, should strictly not be washed with water. • For lasting waterproofing, the cracks and joints on the surface should be thoroughly and carefully sealed prior to application. • The surface defects, which are deeper than 1 cm, should be repaired with MegaTamir Epo, MegaTamir EpoGrout or MegaTamir K 24 hours in advance. In the cases, where structural repair mortar should be used; MegaTamir K Yapısal should be preferred. • Following the surface cleaning, MegaFilm İzo PU, in the case of absorbent surfaces, or MegaFilm İzo Epo, in the case of non-absorbent surfaces, should be applied in single coat in order to enhance adhesion strength and stabilize the surface absorption. Such surfaces coated with MegaFilm İzo PU primer should be let dry for 2 to 3 hours while those coated with MegaFilm İzo Epo should be let dry for 8 to 12 hours. Application Methods • Megaİzo PU 7, which should have been thoroughly stirred prior to the application, should be poured on the surface, which should have been applied with primer and should be maintaining its adhesive nature to a certain extent, and be spread to cover the entire surface with a roller or brush. • Megaİzo PU 7 should be applied in double coat on the surface. • The secondary coat should be applied 12 hours (maximum 36 hours) after the application of the primary coat. • Edge and corner joints should be beveled with Megaİzo PU Mastic in order for the maintenance of waterproofing. • In the cases, where beveling is not performed; Megaİzo Bant should be applied to such inadequately waterproof spots as edge and corner joint spots in order to ensure the maintenance of insulation. • Depending on the nature of the application surface; the secondary coat should be applied after the placement of waterproofing net on the primary coat. In the cases, where net reinforcement is necessary; the net shall be laid on the primary coat before it dries. Application Recommendations • The amount consumed and the thickness of application should be increased in the cases, where ceramic tile coating is applied on the insulation, and the surface, to which Megaİzo PU 7 is applied, should be sanded before it dries completely. • Due care must be taken to ensure that the insulation material is not damaged by mechanical impacts in the cases of coating over the insulation. • The product should not be applied against negative water pressure. • The product should be used before the expiration of its pot life. Any product, the pot life of which has expired, should not be used during the application. • Megaİzo PU 7 is a ready to use product. Any foreign material should not be added into the product during the application. • The product should not be applied on unsound surfaces. The soundness and the load-bearing capacity of old surfaces should be checked prior to adhesion. • The surface should be preserved from air currents and water contact during and after the application. • The product should not be applied to such surfaces, which are exposed to risk of freezing within the next 24 hours, which are frozen or the frost of which is thawing. • Due care should be given to prevent the exposure of the material to direct sunlight in hot weather conditions. • The product should not be applied on extremely windy weather conditions or on hot surfaces, which are exposed to direct sunlight; and in the cases, where application is imperative under such conditions, the environment and the surface should be prepared for application in advance. • The product should not be applied in rainy weather conditions, and the application surface should be preserved from rain for a period of 24 hours. • Refer to our technical support hotline for recommendation on different surface applications. (PHONE: 444 4 595) Surface and Ambient Temperature The surface and ambient temperature should be between +5°C and +35°C whilst at application. Application Limits Bonding Light use Firm use The foregoing values represent the results of the laboratory tests conducted at 23 ± 2°C temperature and 50% ± 5 relative humidity conditions. The values provided as per the table may vary depending on the surface and ambient conditions. APPLICATION INSTRUCTIONS Mixing Ratio Megaİzo PU 7 is a ready to use product. Mixing Equipment Megaİzo PU 7 is a ready to use product. Mixing Period Megaİzo PU 7 is a ready to use product. Application Equipment • Roller • Brush 6 hours 12 hours 7 days Equipment Cleaning The equipment used should be cleaned with cellulosic thinner following the application before the product dries. 82
- Page 1 and 2:
gb buildproject www.gbbuildproject.
- Page 3 and 4:
VERY LOW EMISSION ENVIRONMENTALLY F
- Page 5 and 6:
Definitions in Standards 4
- Page 7 and 8:
Points To Be Considered! 6
- Page 9 and 10:
ADHESIVES MegaFix MegaFix K MegaGra
- Page 11 and 12:
Equipment Cleaning The equipment us
- Page 13 and 14:
Mortar Density: 1.85 ± 0.05 gr/cm
- Page 15 and 16:
CONSUMPTION The consumption amount
- Page 17 and 18:
Application Equipment • Steel not
- Page 19 and 20:
Equipment Cleaning The equipment us
- Page 21 and 22:
Application Equipment • Steel not
- Page 23 and 24:
Grain Size: ≤ 600 µm Color: Gray
- Page 25 and 26:
Equipment Cleaning The equipment us
- Page 27 and 28:
Application Equipment • Steel not
- Page 29 and 30:
Equipment Cleaning The equipment us
- Page 31 and 32: Temperature Resistance: -15°C to +
- Page 33 and 34: 32
- Page 35 and 36: PACKAGING MegaPro Pastemix is deliv
- Page 37 and 38: Application Limits Useful time for
- Page 39 and 40: MegaThermo Adhesive Mortar For Ther
- Page 41 and 42: CONSUMPTION The consumption amount
- Page 43 and 44: PACKAGING BRUFIX is delivered in ne
- Page 45 and 46: 44
- Page 47 and 48: Consumption Amount Calculation Meth
- Page 49 and 50: CONSUMPTION The consumption amount
- Page 51 and 52: CONSUMPTION The consumption amount
- Page 53 and 54: Consumption Amount Calculation Meth
- Page 55 and 56: RECOMMENDED MegaFuga Rustik CONSUMP
- Page 57 and 58: Application Limits Useful time for
- Page 59 and 60: Megaİzo Lastik Mono Cement Based,
- Page 61 and 62: Megaİzo Lastik 7 Polymer Emulsion
- Page 63 and 64: Megaİzo Lastik 10 Polymer Emulsion
- Page 65 and 66: Megaİzo Lastik 15 Polymer Emulsion
- Page 67 and 68: Megaİzo Lastik 3 Hydrophobic Impre
- Page 69 and 70: Megaİzo Lastik 5 Elastomeric Polym
- Page 71 and 72: Megaİzo Lastik 6 Elastomeric Polym
- Page 73 and 74: Megaİzo Kristalize Cement Based, C
- Page 75 and 76: Megaİzo K Polymer Modified, Rubber
- Page 77 and 78: Megaİzo 2K Polymer Modified, Bitum
- Page 79 and 80: Megaİzo CT2/CT3 - CT3 Plus Fibergl
- Page 81: Megaİzo AR Slate Mineral Coated, A
- Page 85 and 86: Megaİzo PU 10 Polyurethane Based,
- Page 87 and 88: Megaİzo PU 15 Polyurethane Based,
- Page 89 and 90: Megaİzo PU 6 Bitumen Modified, Dou
- Page 91 and 92: Megaİzo PU Mastik LM Polyurethane
- Page 93 and 94: Megaİzo PU Mastik HM Polyurethane
- Page 95 and 96: Megaİzo Stoper Cement Based, Insta
- Page 97 and 98: Megaİzo File Reinforcement And Gla
- Page 99 and 100: REPAIR MORTARS MegaTamir İ MegaTam
- Page 101 and 102: MegaTamir K Cement Based Repair And
- Page 103 and 104: MegaTamir K Yapısal Cement Based S
- Page 105 and 106: 104
- Page 107 and 108: PACKAGING MegaTamir Epo is delivere
- Page 109 and 110: or toluene. The non-cured epoxy on
- Page 111 and 112: FLOORING MATERIALS MegaZemin SL20 M
- Page 113 and 114: MegaZemin BYS Surface Hardening Mor
- Page 115 and 116: 114
- Page 117 and 118: MegaSıva İ Cement Based, Manually
- Page 119 and 120: MegaSıva K Cement Based, Manually
- Page 121 and 122: MegaSıva Saten Cement Based, Manua
- Page 123 and 124: MegaSıva Perlitli Cement Based, Ma
- Page 125 and 126: MegaSıva Elyaflı Cement Based, Ma
- Page 127 and 128: MegaSıva Elyaflı K Cement Based,
- Page 129 and 130: MegaSıva Makine İç Cement Based,
- Page 131 and 132: MegaSıva Makine Dıº Cement Based
- Page 133 and 134:
MegaSıva Makine Serpme Cement Base
- Page 135 and 136:
PRIMERS MegaFilm MegaFilm Eko MegaF
- Page 137 and 138:
MegaFilm Eko Surface Preparatory Pr
- Page 139 and 140:
MegaFilm BB High Performance Expose
- Page 141 and 142:
MegaFilm İzo PU Polyurethane Based
- Page 143 and 144:
MegaFilm AK Cement Based Binder Pri
- Page 145 and 146:
ADDITIVES & AUXILIARY MATERIALS Meg
- Page 147 and 148:
MegaAntiFreeze 10 Anti-Freeze Morta
- Page 149 and 150:
MegaClean Ready To Use Joint And Su
- Page 151 and 152:
150
- Page 153 and 154:
152
- Page 155 and 156:
Mantotherm Plaster Mortar Plaster M
- Page 157 and 158:
Mantotherm Dekominera - Grain Textu
- Page 159 and 160:
Mantotherm Dekominera - Fine Graine
- Page 161 and 162:
Mantotherm Acrylic Based Exterior P
- Page 163 and 164:
Mantotherm Acrylic Based Grained Ex
- Page 165 and 166:
Mantotherm Platinum Thermal Insulat
- Page 167 and 168:
Mantotherm Rockwool Thermal Insulat
- Page 169 and 170:
168 .
- Page 171 and 172:
170
- Page 173 and 174:
172
- Page 175 and 176:
174
- Page 177 and 178:
176
- Page 179 and 180:
k k k k k k 178
- Page 181 and 182:
k k k k k k Megaİzo CT3 Plus Mega
- Page 183 and 184:
k k k k k k k k k k k 182
- Page 185 and 186:
Areas Of Use 184
- Page 187 and 188:
Areas Of Use 186
- Page 189 and 190:
Areas Of Use 188
- Page 191 and 192:
Notes 190
- Page 193:
gb buildersbase Premier Building Su