You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Modular & Volumetric Building<br />
Raising the Bar for Offsite Construction<br />
As one of the largest specialist off-site manufacturing businesses in the UK, Caledonian Modular offers much more than your<br />
everyday construction company. Founded over 50 years ago, they supply around the UK from a 40-acre advanced manufacturing<br />
site in Newark, Nottinghamshire.<br />
Over the last few years’ Caledonian has<br />
achieved significant growth and now has<br />
a turnover of over £50m. A series of new<br />
contract wins look set to continue this success<br />
with a target of nearly doubling turnover by<br />
2019, an objective they are well on the way to<br />
achieving.<br />
Mind you, this kind of performance hasn’t come<br />
about on its own, but from a clear vision for the<br />
company, backed by a strong management<br />
team, and a focus on projects that are aligned<br />
with its key strengths and sectors that it<br />
understands; education, housing and<br />
healthcare. These include an ability to achieve<br />
up to 94 per cent completion of building<br />
modules off-site, meaning buildings can be<br />
handed over in up to half the time it takes for a<br />
traditional build, and with less disruption to<br />
roads and nearby buildings. Underlying this<br />
ability to consistently deliver projects on time<br />
and within budget is a commitment to<br />
excellence through the use of BIM, design for<br />
manufacture and assembly (DMFA) and lean<br />
manufacturing techniques.<br />
A case in point is the £55m contract awarded to<br />
Caledonian by Laing O’Rourke to build the<br />
accommodation modules for Hinkley Point C<br />
(HPC) nuclear power station in Somerset. The<br />
contract comprises 1,496 en-suite bedrooms<br />
across 44 individual buildings at two locations.<br />
The first accommodation units rolled off the<br />
factory production line in March last year and<br />
were delivered 96% finished, ready for<br />
rapid completion. Each 34<br />
bedroom block<br />
will<br />
be completed on site<br />
within just eight<br />
weeks from delivery.<br />
The entire HPC<br />
project is worth £18<br />
billion across the<br />
board for the<br />
Nuclear Build<br />
programme, the<br />
largest modular<br />
government project<br />
across the entire<br />
country.<br />
Another recent<br />
success, in<br />
partnership with<br />
their partner<br />
architects HLM,<br />
involved securing<br />
first place on the modular framework to provide<br />
permanent, component-based buildings and<br />
facilities for the ESFA’s new secondary schools<br />
block replacement programme. They won this<br />
procurement competition with others from the<br />
off-site construction sector, securing top spot<br />
against 64 other bidders. Being awarded first<br />
place immediately secured two projects with a<br />
combined value of £12 million, with the potential<br />
to realise further schemes within the £250<br />
million funding allocated to the lot.<br />
A track record of delivering these projects on<br />
time and within budgets means the<br />
management team can replicate their<br />
approach on each successive<br />
new contract – a great<br />
confidence<br />
builder with clients and main contractors. A<br />
case in point is the £25m contract awarded to<br />
Caledonian by Bowmer & Kirkland, announced<br />
in the last few weeks, for the 680 bedroom<br />
First Way Campus student development in<br />
Wembley.<br />
The ability of Caledonian’s modular building<br />
system to help meet the strict deadline dates<br />
on this project, which required handover in<br />
time for Euro 2020, helped secure this contract.<br />
As did their pre-engineered fire compliant<br />
modular solution suitable for a high rise<br />
development, which rises from 7 to 11 floors.<br />
Other recent contracts wins include the MOD<br />
Single Living Accommodation (SLA) for MoD<br />
Lyneham in Wiltshire as part of a £35m Kier<br />
development. Part of the Army Basing<br />
Programme, the project will create 296 rooms<br />
over 5 blocks, providing accommodation for<br />
troops returning from overseas and relocating<br />
within the UK. The latest contract continues a<br />
long partnership with the MOD, with the team<br />
successfully completing 1,145 rooms over 12<br />
blocks on the same base for Kier in 2012/13.<br />
Caledonian Modular prides themselves on the<br />
fact that their projects look as authentic as a<br />
traditional-build, indeed they are<br />
indistinguishable, while remaining as efficient<br />
and cost-effective as they do. By sticking to<br />
what they know – modular and off-site<br />
construction systems - underpinned by BIM,<br />
DFMA and lean manufacturing, this<br />
Nottingham based company is raising industry<br />
standards and demonstrating how modular<br />
buildings have the ability to resolve the UK’s<br />
building shortages quickly and efficiently.<br />
To find out more about Caledonian’s modular<br />
building system, call: 01636 821645 or visit the<br />
below website.<br />
www.caledonianmodular.com<br />
30 <strong>MMC</strong><br />
Nov 2018 <strong>M10</strong><br />
see us at<br />
Offsite,<br />
stand no.<br />
D3