07.11.2018 Views

MMC 52pp M10 WEB

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Offsite Construction<br />

is Here to Stay<br />

see us at<br />

Offsite,<br />

stand no.<br />

D21<br />

Recent press coverage has focussed heavily on Offsite Construction providing the answer in a number of key sectors,<br />

due to the speed and efficiency of modular construction.<br />

Premier Modular has been delivering<br />

award winning offsite and volumetric<br />

solutions for more than 60 years and<br />

prides itself on its ability to provide the highest<br />

quality buildings, offering a skilled and<br />

knowledgeable design and build service. Part<br />

of a large multi-national industrial group, Waco<br />

International, Premier has the strong financial<br />

backing provided by the Group, which has<br />

enabled it to build a substantial modular hire<br />

fleet. This coupled with the manufacturing<br />

capacity offered by a 22 acre site means that<br />

Premier is ideally suited to deliver quality<br />

buildings for both hire and sale throughout the<br />

UK, no matter how large or small.<br />

Premier’s ability to deliver a modular solution<br />

on a massive scale is evidenced by the series of<br />

modular complexes they have provided at<br />

Hinkley Point C in Somerset. The buildings<br />

deliver 38,000 sqm of offices and welfare<br />

facilities to house all the management and<br />

technical personnel required for the<br />

construction phase of the new nuclear power<br />

station. The HPC requirement for the best<br />

temporary welfare and office facilities in the<br />

UK, delivered within a strict timescale, was a<br />

challenge Premier met and achieved and<br />

resulted in their being appointed to deliver an<br />

additional modular complex for the critically<br />

important infrastructure project.<br />

Developing such strong client relationships is at<br />

the core of Premier’s approach and their recent<br />

partnership with ISG has delivered 8 school<br />

facilities in 12 months as part of Manchester<br />

City Council’s Education Basic Needs<br />

framework. The first school, St Margaret’s<br />

CofE Primary School, was chosen by<br />

Manchester City Council to be their first pilot for<br />

delivering a project to BIM Level 2, including<br />

their first Asset Information Model. The 775m2<br />

2-storey building provided new nursery facilities<br />

and 3 reception classrooms, enabling the<br />

school to expand and accommodate an<br />

additional form of entry. This scheme was<br />

named as the winner of the Digital Construction<br />

category in the North West Regional<br />

Construction Awards for 2018, as well as<br />

receiving Highly Commended in the Integration<br />

and Collaborative Working category.<br />

Standardisation in construction delivery<br />

produces better end product quality, reduction<br />

in manufacturing costs, reduced design costs<br />

with less waste and can be achieved through<br />

the use of standardised components,<br />

prefabricated panels and modular construction.<br />

This volumetric approach to construction was<br />

used in the award winning construction of a 5<br />

storey student accommodation block, The<br />

Foundry, in Newcastle City Centre, delivered in<br />

partnership with Sir Robert McAlpine. This<br />

block consisted of a mixture of 54 studio flats,<br />

105 ensuite bedrooms and 2 accessible rooms,<br />

associated living spaces, kitchens and study<br />

areas.<br />

The speed of delivery for this project gave the<br />

investors a whole year of additional return and<br />

was a deciding factor in the project being<br />

named as the Project of the Year (up to £10m) at<br />

the Construction News Awards.<br />

This approach has also been used to great<br />

effect in other residential projects and following<br />

their appointment to the CHIC BuildSmart<br />

framework, Premier have worked closely with<br />

their framework partners to develop<br />

standardised housing products, delivered within<br />

an EU-compliant framework – the perfect<br />

solution to the critically important delivery of<br />

housing stock highlighted frequently in the<br />

news.<br />

The standard designs, coupled with CHIC’s<br />

existing proven materials supply chain, has<br />

resulted in a more cost efficient, quality product,<br />

with speed of delivery. Whilst the cost benefits<br />

of this scheme have been delivered by the<br />

development of a standardised product,<br />

flexibility is still available to procure bespoke<br />

designs and solutions where required.<br />

Premier’s forward thinking attitude means that<br />

they are always looking for product<br />

improvements and innovation; Premier believes<br />

that the fire resistance of buildings is very<br />

important, whether for a temporary or<br />

permanent building. At Premier we feel it is not<br />

good enough to provide our clients with an<br />

assumption that our buildings are ‘fire proof’<br />

based on various codes and data sheets. When<br />

developing our latest product, as part of our<br />

quality control during development, we ensured<br />

the product went through real life fire tests and<br />

received certification for this.<br />

In a market where shortages exist, building<br />

standards are extremely high and sustainability<br />

is of growing importance, standardisation and<br />

offsite construction as delivered by Premier has<br />

to be a big part of the solution.<br />

www.premiermodular.co.uk<br />

38 <strong>MMC</strong><br />

Nov 2018 <strong>M10</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!