Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Offsite Construction<br />
is Here to Stay<br />
see us at<br />
Offsite,<br />
stand no.<br />
D21<br />
Recent press coverage has focussed heavily on Offsite Construction providing the answer in a number of key sectors,<br />
due to the speed and efficiency of modular construction.<br />
Premier Modular has been delivering<br />
award winning offsite and volumetric<br />
solutions for more than 60 years and<br />
prides itself on its ability to provide the highest<br />
quality buildings, offering a skilled and<br />
knowledgeable design and build service. Part<br />
of a large multi-national industrial group, Waco<br />
International, Premier has the strong financial<br />
backing provided by the Group, which has<br />
enabled it to build a substantial modular hire<br />
fleet. This coupled with the manufacturing<br />
capacity offered by a 22 acre site means that<br />
Premier is ideally suited to deliver quality<br />
buildings for both hire and sale throughout the<br />
UK, no matter how large or small.<br />
Premier’s ability to deliver a modular solution<br />
on a massive scale is evidenced by the series of<br />
modular complexes they have provided at<br />
Hinkley Point C in Somerset. The buildings<br />
deliver 38,000 sqm of offices and welfare<br />
facilities to house all the management and<br />
technical personnel required for the<br />
construction phase of the new nuclear power<br />
station. The HPC requirement for the best<br />
temporary welfare and office facilities in the<br />
UK, delivered within a strict timescale, was a<br />
challenge Premier met and achieved and<br />
resulted in their being appointed to deliver an<br />
additional modular complex for the critically<br />
important infrastructure project.<br />
Developing such strong client relationships is at<br />
the core of Premier’s approach and their recent<br />
partnership with ISG has delivered 8 school<br />
facilities in 12 months as part of Manchester<br />
City Council’s Education Basic Needs<br />
framework. The first school, St Margaret’s<br />
CofE Primary School, was chosen by<br />
Manchester City Council to be their first pilot for<br />
delivering a project to BIM Level 2, including<br />
their first Asset Information Model. The 775m2<br />
2-storey building provided new nursery facilities<br />
and 3 reception classrooms, enabling the<br />
school to expand and accommodate an<br />
additional form of entry. This scheme was<br />
named as the winner of the Digital Construction<br />
category in the North West Regional<br />
Construction Awards for 2018, as well as<br />
receiving Highly Commended in the Integration<br />
and Collaborative Working category.<br />
Standardisation in construction delivery<br />
produces better end product quality, reduction<br />
in manufacturing costs, reduced design costs<br />
with less waste and can be achieved through<br />
the use of standardised components,<br />
prefabricated panels and modular construction.<br />
This volumetric approach to construction was<br />
used in the award winning construction of a 5<br />
storey student accommodation block, The<br />
Foundry, in Newcastle City Centre, delivered in<br />
partnership with Sir Robert McAlpine. This<br />
block consisted of a mixture of 54 studio flats,<br />
105 ensuite bedrooms and 2 accessible rooms,<br />
associated living spaces, kitchens and study<br />
areas.<br />
The speed of delivery for this project gave the<br />
investors a whole year of additional return and<br />
was a deciding factor in the project being<br />
named as the Project of the Year (up to £10m) at<br />
the Construction News Awards.<br />
This approach has also been used to great<br />
effect in other residential projects and following<br />
their appointment to the CHIC BuildSmart<br />
framework, Premier have worked closely with<br />
their framework partners to develop<br />
standardised housing products, delivered within<br />
an EU-compliant framework – the perfect<br />
solution to the critically important delivery of<br />
housing stock highlighted frequently in the<br />
news.<br />
The standard designs, coupled with CHIC’s<br />
existing proven materials supply chain, has<br />
resulted in a more cost efficient, quality product,<br />
with speed of delivery. Whilst the cost benefits<br />
of this scheme have been delivered by the<br />
development of a standardised product,<br />
flexibility is still available to procure bespoke<br />
designs and solutions where required.<br />
Premier’s forward thinking attitude means that<br />
they are always looking for product<br />
improvements and innovation; Premier believes<br />
that the fire resistance of buildings is very<br />
important, whether for a temporary or<br />
permanent building. At Premier we feel it is not<br />
good enough to provide our clients with an<br />
assumption that our buildings are ‘fire proof’<br />
based on various codes and data sheets. When<br />
developing our latest product, as part of our<br />
quality control during development, we ensured<br />
the product went through real life fire tests and<br />
received certification for this.<br />
In a market where shortages exist, building<br />
standards are extremely high and sustainability<br />
is of growing importance, standardisation and<br />
offsite construction as delivered by Premier has<br />
to be a big part of the solution.<br />
www.premiermodular.co.uk<br />
38 <strong>MMC</strong><br />
Nov 2018 <strong>M10</strong>