Bay Harbour: February 06, 2019
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Wednesday <strong>February</strong> 6 <strong>2019</strong><br />
News<br />
WORK ON reinstating the<br />
critical road link between<br />
Sumner and Lyttelton is on<br />
track to be finished at the end of<br />
next month.<br />
The road has been closed to<br />
the public since tonnes of rock<br />
came tumbling down onto it<br />
from the surrounding cliffs<br />
during the <strong>February</strong> 22, 2011,<br />
earthquake.<br />
Said city council<br />
spokeswoman Lynette Ellis:<br />
“The final push is on to get the<br />
road surface laid, the safety<br />
barriers installed, and the line<br />
markings done. While our<br />
contractors are doing this work,<br />
there will be trucks moving<br />
through both Lyttelton and the<br />
Redcliffs-Sumner areas.<br />
“At the Lyttelton end of the<br />
road, stonemasons are working<br />
to finish the retaining walls. The<br />
Home & Business Security • Cameras • Gates & Fencing<br />
Access Control • Alarm Monitoring • Home Automation<br />
Alarms Electrical Cameras Intercoms Auto Gates<br />
Residential and Business Security<br />
Tailor Made Security Solutions<br />
All Your Electrical Needs<br />
Custom Designed Automatic Gates<br />
Innovative Intercom Systems<br />
Pet Friendly Sensors<br />
Security Cameras<br />
Access Control Systems<br />
Electric Fencing<br />
Service and Maintenance<br />
24/7 Fault Service<br />
Locally owned and operated<br />
All faults attended that same day<br />
walls are being built from rocks<br />
that were salvaged from Sumner<br />
Rd as part of the rockfall riskreduction<br />
work.”<br />
Latest Christchurch news at www.star.kiwi<br />
Sumner Rd on track for March finish<br />
CRITICAL: Repairs to Sumner Rd are set to be finished by the<br />
end of March.<br />
tree trouble?<br />
call us 384 9630<br />
www.fourseasonstreecare.co.nz<br />
The work on Sumner Rd is<br />
being jointly funded by the<br />
city council and New Zealand<br />
Transport Agency.<br />
Ms Ellis said getting this<br />
critical transport route between<br />
the city and the Port of Lyttelton<br />
reopened would be a major<br />
milestone.<br />
“It will make moving overdimension<br />
freight to and from<br />
the port much easier and it<br />
will mean no more dangerous<br />
goods convoys through the<br />
tunnel,” she said.<br />
“It will also reconnect the<br />
communities of Lyttelton and<br />
Sumner and open up access to<br />
FROM<br />
cOMMIsIOn<br />
Getting Sumner Rd<br />
reopened has involved:<br />
•Blasting 100,000 cu m<br />
of rock and moving it to<br />
Gollans <strong>Bay</strong> Quarry<br />
•Building a 407m long<br />
catch bench to intercept<br />
falling rocks from the Crater<br />
Rim Bluffs. The back of the<br />
bench is 18m metres high,<br />
and the 15m wide floor<br />
of cushioning material is<br />
designed to trap falling<br />
rocks<br />
•Building a 50m long, 7m<br />
high rock interception bund<br />
•Reinstating 2.6km of road<br />
•Installing 2.6km of safety<br />
barrier<br />
•Replacing/resealing<br />
16,700 sq m of road<br />
•Repairing/rebuilding 30<br />
retaining walls, the biggest<br />
of which is 132m long and<br />
7m high<br />
•Planting 30,000 plants<br />
the Port Hills for cyclists.<br />
“When the road does reopen,<br />
there will be changes in traffic<br />
patterns as some heavy vehicles<br />
return to moving through<br />
Redcliffs, Sumner, and parts<br />
of Lyttelton for the first time<br />
since the <strong>February</strong> 22, 2011,<br />
earthquake. We will be working<br />
with the affected communities<br />
to let them know about the<br />
changes.”<br />
mirror mirror on the wall...<br />
...we have the<br />
fairest<br />
fee of all<br />
• Full Professional 5 star Service<br />
• Free Appraisals for all<br />
BAY HARBOUR<br />
Local<br />
News<br />
Now<br />
In Brief<br />
PAGE 3<br />
Fire rages, homes at risk<br />
$2500 FROM CONCERT<br />
Lyttelton country band The<br />
Eastern raised $2500 for the<br />
Seafarers’ Centre at a benefit<br />
concert over the holidays. The<br />
centre provides seafarers with<br />
assistance, care support and wi-fi<br />
so they can speak to their family<br />
back home. The centre has had<br />
about 10,000 visits from seafarers<br />
docking in Lyttelton since it<br />
opened three years ago. Lyttelton<br />
Seafarers’ Centre Charitable<br />
Trust chairman Reverend John<br />
McLister said the money will<br />
help ensure it could continue to<br />
provide seafarers with assistance.<br />
STATION WORK TO START<br />
Remediation of the Little River<br />
railway station is on schedule to<br />
begin at the end of the month.<br />
The work includes replacing<br />
rotten timber, replicating the<br />
damaged skylight that was<br />
removed, painting the exterior,<br />
and improving accessibility. Staff<br />
are currently working through the<br />
detailed designs for the repairs.<br />
SKATE BOWL TENDERS<br />
Tenders have been called for the<br />
construction of the Governors <strong>Bay</strong><br />
Community Centre skate bowl<br />
and pump track. Construction<br />
is expected to start in autumn<br />
and take about two months to<br />
complete. The construction is part<br />
of the upgrade of Frame Reserve.<br />
FREE QUOTES<br />
P: (03) 384 0995 24/7 E: info@actionsecurity.co.nz<br />
www.actionsecurity.co.nz<br />
t h e t r e e p e o p l e<br />
f o u r s e a s o n s t r e e C a r e<br />
Debra Hakaraia<br />
Director | Principal<br />
Contact Us: Telephone 0275 620 420<br />
debra.hakaraia@smartrealestate.co.nz<br />
www.smartrealestate.co.nz<br />
Licenced under the Real Estate Agents Act 2008<br />
UNDER NEW<br />
OWNERSHIP<br />
Heineken<br />
12pk Bottles<br />
Canadian Club/<br />
Jim Beam<br />
10pk Bottles<br />
Jamesons<br />
Irish<br />
Whiskey<br />
700ml<br />
Gordons<br />
Gin<br />
1 Litre<br />
Teachers<br />
Whisky<br />
1 Litre<br />
The Ned<br />
Excludes P/Noir & Chardonnay<br />
$<br />
23 99<br />
pack<br />
$<br />
23 99<br />
each<br />
$<br />
32 99<br />
each<br />
$<br />
36 99<br />
each<br />
$<br />
34 99<br />
each<br />
$<br />
14 99<br />
each<br />
9 Humphreys Drive, Ferrymead (down Kite Lane, opposite Casual & Country) | Phone: 03 376 4079 | OPEN 7 DAYS<br />
Prices valid Wednesday<br />
Feb 6 – Tues Feb 19