18.03.2019 Views

Project Lifecycle QC

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong> <strong>Lifecycle</strong><br />

<strong>Project</strong> stage<br />

Opportunity <strong>Project</strong><br />

PS01 (approval required)<br />

Draft Bid Submission<br />

PS02 (no approval required)<br />

Bid Submission<br />

PS03 (approval required)<br />

Active <strong>Project</strong><br />

PS04 (approval required)<br />

Description<br />

Part 1<br />

All projects must begin at stage one and move through the subsequent stages<br />

in sequence. A <strong>Project</strong> saved at PS01 must be approved, using the Grants of<br />

Authority based on the amount in the Estimated Cost of Preparing the Bid field.<br />

When the bid has been prepared update the relevant fields on the <strong>Project</strong><br />

record. Assess the bid risk using the Risk GoA and <strong>Project</strong> Missing Fields tabs.<br />

Change to stage PS03 and Save to send into Workflow for authorisation to<br />

submit the bid, based on the Grants of Authority Risk level and Fee amount.<br />

When the contract is signed review the <strong>Project</strong> record with a Finance Business<br />

Partner. The <strong>Project</strong> moves to PS04, and is Active after being approved.<br />

Navigate to <strong>Project</strong> management à <strong>Project</strong> information à <strong>Project</strong>s<br />

Opportunity <strong>Project</strong> PS01: twenty-six mandatory fields must be completed. To start click New<br />

1<br />

<strong>Project</strong> Master File – <strong>Project</strong> tab<br />

1<br />

1<br />

2<br />

7<br />

3<br />

4<br />

5<br />

6<br />

1<br />

2<br />

<strong>Project</strong> code*: automatically assigned when the<br />

<strong>Project</strong> is saved. The <strong>Project</strong> keeps the same<br />

code number throughout its entire lifecycle<br />

<strong>Project</strong> name*: type the <strong>Project</strong> name.<br />

(if Client Unknown is selected in the Customer<br />

field [see 8 below] add the Client’s name here)<br />

4<br />

5<br />

6<br />

<strong>Project</strong> type*: select Non fee-earning (TIP: in an<br />

empty field hit the [Space bar] to see all choices)<br />

Start date*: defaults to today (change if necessary)<br />

End date*: defaults to 31/12/2099 (don’t change)<br />

3<br />

<strong>Project</strong> manager*: defaults to you (change if<br />

necessary)<br />

7<br />

Status*: change to Active when ready to Save and<br />

send into Workflow for authorisation<br />

8 9<br />

10<br />

11 12<br />

13<br />

14<br />

15<br />

16<br />

8<br />

Customer: select the Client from the list (if not<br />

visible ask Finance to set up as a new Customer)<br />

13<br />

Billable status: defaults to Billable<br />

9<br />

11<br />

12<br />

Currency / 10 Currency type*: change the<br />

default (GBP) if necessary<br />

Invoice level: select INV.RULE<br />

Invoice rule: select Time & Disbursements (this<br />

can be changed later to reflect the contract)<br />

14<br />

15<br />

16<br />

Cost centre*: select your Business Unit<br />

Projstage*: select Opportunity <strong>Project</strong> PS01<br />

Legentity*: select from the list (contact the Legal<br />

Team for guidance if necessary)


<strong>Project</strong> <strong>Lifecycle</strong><br />

Part 2<br />

<strong>Project</strong> Master File - General Data tab<br />

17 17 Sector*: select from the list<br />

18<br />

18<br />

Discipline*: select from the list (filtered by Sector)<br />

19 19<br />

Subsector*: select from the list (filtered by Discipline)<br />

20<br />

20<br />

Initiating Office*: select from the list<br />

21 21<br />

<strong>Project</strong> Director*: select from the list<br />

22<br />

22<br />

Delivery Country*: defaults to UK (change if necessary)<br />

23<br />

23<br />

High Risk Country*: defaults to Yes or No based on the<br />

Delivery Country<br />

<strong>Project</strong> Master File - Opportunity Data tab<br />

24<br />

25<br />

Bid Director*: select from the list<br />

Bid Manager*: select from the list<br />

26<br />

Estimated Cost Prep. Bid*: enter the estimated<br />

currency amount of preparing the bid<br />

Saving a <strong>Project</strong> Master File at Opportunity <strong>Project</strong> stage PS01<br />

1<br />

3<br />

2<br />

4<br />

1<br />

2<br />

3<br />

4<br />

Status*: all twenty-six fields must be completed before the new <strong>Project</strong> record can be saved. Saving with<br />

the Status Draft will not send it into workflow for authorisation; changing to Active and clicking Save will.<br />

The Grants of Authority matrix sends the authorisation task to the appropriate person based on the<br />

currency amount entered in the Estimated Cost Prep. Bid field.<br />

Save: click to save the <strong>Project</strong> record. Ensure you get an on-screen message when you click Save, even if<br />

it is an Error message due to missing mandatory fields. If no message is shown click Save again.<br />

Update relations: shown if any of the key <strong>Project</strong> fields have been updated since the last Save. They are<br />

automatically ticked. If the changes are correct click OK. If not correct click Cancel and amend the fields.<br />

Success: PS01 <strong>Project</strong>s at Status ‘Active’ enter Workflow for approval to proceed with bid development.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!