23.10.2019 Views

The Garage 301

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11<br />

NEW MATERIALS<br />

WAREHOUSE UNDER<br />

CONSTRUCTION AT<br />

FUCHS<br />

Construction of a £5m raw<br />

materials warehouse with<br />

4,000 pallet spaces is underway<br />

at FUCHS Lubricants’<br />

Staffordshire headquarters.<br />

<strong>The</strong> warehouse is the latest<br />

step in a £10million<br />

investment programme at<br />

FUCHS UK, which has also<br />

seen the introduction of a<br />

range of innovative manufacturing<br />

plant machinery<br />

and a new multi-line pallet<br />

loading robot arm.<br />

Building work began in<br />

August and the framework<br />

structure and roof have now<br />

been completed, the external<br />

cladding is now well underway.<br />

<strong>The</strong> fully automated High<br />

Bay warehouse is due for<br />

completion in the second<br />

quarter of 2020 and will<br />

significantly increase the<br />

amount of raw materials the<br />

business can store on-site.<br />

Its construction will also<br />

allow an existing building to<br />

become a specialist packaging<br />

warehouse.<br />

Mark Gray, Head of Operations<br />

said: “We have an<br />

ambition to place FUCHS<br />

Lubricants at the forefront<br />

of R&D, manufacturing and<br />

distribution of lubricants in<br />

the UK.<br />

“This raw materials warehouse<br />

represents a significant<br />

investment for the<br />

business, and a further step<br />

towards that goal.<br />

“<strong>The</strong> warehouse includes<br />

sophisticated automation,<br />

which will future-proof the<br />

business and create costsaving<br />

benefits.”<br />

Two wire guided driverless<br />

Very Narrow Aisle trucks will<br />

operate in the warehouse,<br />

benefitting from high travel<br />

and lift speeds, without operator<br />

intervention.<br />

<strong>The</strong> warehouse has a capacity<br />

of approximately<br />

4,000 pallet spaces, with<br />

ability for automatic or manual<br />

storage place allocation.<br />

<strong>The</strong> high-tech Warehouse<br />

Control and Warehouse<br />

Management Systems<br />

streamline the process, with<br />

benefits including goods receipt<br />

entry and booking, a<br />

paperless put away process,<br />

inventory support and batch<br />

traceability.<br />

TETROSYL LOOKS TO BUILD ON<br />

NEW PARTNERSHIP WITH IAAF<br />

As one of the UK’s leading manufacturers and distributors<br />

of automotive chemicals and parts, Tetrosyl, is the<br />

latest name to register as a fully-fledged member of the<br />

Independent Automotive Aftermarket Federation (IAAF),<br />

continuing the rapid growth of the IAAF network.<br />

Established in 1954, the Tetrosyl Group has grown into<br />

one of the most well-established British brands in recent<br />

decades, and operates household names including Carlube,<br />

Carplan, T-cut, Bluecol and in more recent times, Quinton<br />

Hazell components, TJ Filtration and Ci Ignition.<br />

MOT Wallets from<br />

£178/1000<br />

www.motwallets.co.uk 0800 097 5254<br />

sales@kpsprinters.co.uk<br />

NEWS<br />

DAYCO ORIGINAL EQUIPMENT<br />

(OE) DAMPER PULLEYS OFFER PROFIT<br />

OPPORTUNITIES FOR WORKSHOPS!<br />

Extensive Range – Includes Bolts<br />

Where Needed<br />

MODERN powerplants are highly engineered<br />

to deliver the optimum combination of<br />

power and torque, alongside fuel efficiency<br />

and minimal exhaust emissions. This<br />

objective often comes at the cost of high<br />

levels of engine vibration, which is generally intensified by<br />

the significant pressures present in the engine’s combustion<br />

chambers, an occurrence especially prevalent with diesel<br />

units.<br />

This vibration is transmitted through the crankshaft and<br />

therefore has a significant impact on the engine’s power<br />

transmission drive systems. To reduce this problem, Dayco<br />

engineers have developed a range of damper pulleys, with<br />

the prefix DPV.<br />

Over time dampers can lose their efficiency, increasing<br />

the risk of failure in other parts of the engine’s drive<br />

systems.<br />

Workshops can profit by checking for signs of wear at<br />

40,000-mile intervals or when replacing the auxiliary belt.<br />

Technicians must be aware however, that in order to<br />

check the damper correctly, it needs to be removed from<br />

the engine because the back, as well as the front needs<br />

to be examined to fully assess its condition. Whatever its<br />

condition though, Dayco suggests they are changed every<br />

time the timing belt is replaced. In addition, whether it<br />

needs to be replaced or not, if its fixing bolts are designed<br />

to stretch on initial fitment, these must be changed, as they<br />

will no longer meet their design tolerances if reused.<br />

For maximum convenience and to ensure the highest<br />

standards are maintained during its installation, each<br />

damper in the 160 plus-strong Dayco range that technically<br />

also requires its bolts to be replaced, comes complete with<br />

the correct specification bolts.<br />

This assurance and the 95% vehicle parc coverage the<br />

programme provides, makes Dayco DPVs the ultimate<br />

choice for the discerning workshop.<br />

For more information regarding the OEM quality power<br />

transmission products in the Dayco range, please<br />

email: info.uk@dayco.com or visit: www.dayco.com<br />

10, 11 News.indd 2 08/10/2019 11:38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!