Specific requirements

Technical protective measures

To be able to assess the functional capability of the

activated carbon or other materials at all times, including

in ongoing operation, it is strongly recommended

that suitable monitoring systems (e.g. a gas

analyser) should be installed.

Organisational protective measures

If the use of ferrous materials or activated carbon

is unavoidable, zero-emission or low-emission types

must be chosen (e.g. pelleted or coated products

rather than powdered products).

Classification of Ex zones

Surroundings of external desulphurisation units

(outside digesters)

Outdoors

Desulphurisation system technically leak-tight.

No zoning necessary, unless the manufacturer’s

instructions specify different classification of

zones.

In inside spaces

Desulphurisation system technically leak-tight.

Zone 2: entire space

13. Requirements for gas analysis

A variety of gas analysis systems are used in practice,

with a distinction being drawn between mobile

and fixed systems and between manual and automated

systems. The following gas constituents are

regularly detected: CH 4

, CO 2

, H 2

S and O 2

.

Organisational protective measures

Regular maintenance and calibration of the gas

analysis systems is recommended in accordance

with manufacturer’s instructions.

Technical protective measures

The gas being measured must be discharged to the

open air or returned to the gas stream. Alternatively,

a forced ventilation system must be installed with a

minimum air exchange rate that ensures adequate

dilution of the maximum possible gas volumes or

the gas facility must be relocated to the CHP unit

installation room.

Classification of Ex zones

After gas analysis, the gas is discharged from the

analyser to the open air.

Zone 2: in the vicinity of the discharge opening.

Technically leak-tight gas analyser in combination

with adequate organisational measures

in combination with regular leak checks and

adequate ventilation in the room.

No zoning necessary, unless the manufacturer’s

instructions specify different classification of

zones.

46