Report Investigation of gas blowout on Snorre A - Well Integrity ...

Report Investigation of gas blowout on Snorre A - Well Integrity ...

Report Investigation of gas blowout on Snorre A - Well Integrity ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

shut-in, well barriers were established, i.e. with a plug directly above the reservoir secti<strong>on</strong>,<br />

and the well was filled with brine. 5<br />

The well was c<strong>on</strong>sidered to be "complex". This was related to (see Figure 2):<br />

- Factors which give the well reduced integrity (corrosi<strong>on</strong>, leaks).<br />

- Unc<strong>on</strong>venti<strong>on</strong>al well completi<strong>on</strong> with a great many small completi<strong>on</strong> elements.<br />

- Additi<strong>on</strong>al completi<strong>on</strong> elements installed in the well in c<strong>on</strong>necti<strong>on</strong> with repairs (Scabliner<br />

and straddle)<br />

- Downhole well c<strong>on</strong>trol valves<br />

Figure 2. <strong>Well</strong> sketch reflecting status <str<strong>on</strong>g>of</str<strong>on</strong>g> well integrity prior to start-up <str<strong>on</strong>g>of</str<strong>on</strong>g> the well operati<strong>on</strong>.<br />

3 COURSE OF EVENTS<br />

This chapter describes the actual course <str<strong>on</strong>g>of</str<strong>on</strong>g> events, based <strong>on</strong> informati<strong>on</strong> obtained in the<br />

investigati<strong>on</strong>. The activities are described in chr<strong>on</strong>ological order. The descripti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

assessments refers to the evaluati<strong>on</strong>s that were made by the pers<strong>on</strong>nel involved during the<br />

course <str<strong>on</strong>g>of</str<strong>on</strong>g> events. This chapter is divided into three main parts.<br />

The first part focuses primarily <strong>on</strong> the planning <str<strong>on</strong>g>of</str<strong>on</strong>g> the well operati<strong>on</strong>, and relates to the time<br />

period from the spring <str<strong>on</strong>g>of</str<strong>on</strong>g> 2004 until start-up <str<strong>on</strong>g>of</str<strong>on</strong>g> SNA <strong>on</strong> 16 November 2004. The sec<strong>on</strong>d part<br />

mainly deals with start-up <str<strong>on</strong>g>of</str<strong>on</strong>g> the well operati<strong>on</strong> and up to when the well went out <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>trol<br />

<strong>on</strong> 28 November 2004. The third part largely describes measures implemented to handle the<br />

situati<strong>on</strong> when the well ran out <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>trol.<br />

5 CaCl2/CaBr2 brine with 1.47 s.g.<br />

11