The status <str<strong>on</strong>g>of</str<strong>on</strong>g> the HAZOPs is unclear. RESU manager SNA has approved HAZOP 1, while<br />

HAZOP 2 has not been approved. Both have been implemented after the program was<br />

completed.<br />

Requirement:<br />

• The Activity Regulati<strong>on</strong>s, Secti<strong>on</strong> 22 relating to Procedures requires that the<br />

resp<strong>on</strong>sible party shall ensure that procedures are established and used in such a way<br />

as to fulfill their intended functi<strong>on</strong>s.<br />

• AR03 ”Drilling, well and producti<strong>on</strong> activities”, Chapter 2.10.2 ”Hazard analysis”<br />

5.1.19 N<strong>on</strong>-c<strong>on</strong>formity 19. HAZOPs have not been communicated to the executing link<br />

Pers<strong>on</strong>nel from SNA were not involved in implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the two HAZOPs. It is unclear<br />

whether pers<strong>on</strong>nel <strong>on</strong> SNA were made aware <str<strong>on</strong>g>of</str<strong>on</strong>g> the results <str<strong>on</strong>g>of</str<strong>on</strong>g> HAZOPs 1 and 2, or whether<br />

they were published <strong>on</strong> Statoil's internal computer network. We assume that such informati<strong>on</strong><br />

shall be communicated actively and in a timely manner.<br />

Evidence:<br />

Statements from interviews show that the executing pers<strong>on</strong>nel <strong>on</strong> the facility were not aware<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the HAZOPs.<br />

Requirement:<br />

• The Management Regulati<strong>on</strong>s, Secti<strong>on</strong> 12 relating to Informati<strong>on</strong> require that the<br />

necessary informati<strong>on</strong> is disseminated to relevant user at the right time.<br />

5.1.20 N<strong>on</strong>-c<strong>on</strong>formity 20. Pr<str<strong>on</strong>g>of</str<strong>on</strong>g>essi<strong>on</strong>al expertise does not assess overall risk<br />

On 24 November 2004, there was a meeting between the program engineer and the acting<br />

lead pr<str<strong>on</strong>g>of</str<strong>on</strong>g>essi<strong>on</strong>al for cementing from the main <str<strong>on</strong>g>of</str<strong>on</strong>g>fice (HQ) at Forus 32 . A minor change was<br />

proposed at this meeting. It was now decided that the scab-liner should be perforated in order<br />

to have a c<strong>on</strong>trolled equalizati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the pressure, prior to cutting and pulling. (Previous plans<br />

included perforati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the tail pipe).<br />

On 25 November 2004, there was another meeting, this time between the program engineer<br />

and a well technologist from the well c<strong>on</strong>trol group at HQ. In this meeting, the change<br />

proposed <strong>on</strong> the previous day was discussed/verified.<br />

Evidence:<br />

It does not emerge from the well program that the c<strong>on</strong>sequence <str<strong>on</strong>g>of</str<strong>on</strong>g> this change in relati<strong>on</strong> to<br />

the status <str<strong>on</strong>g>of</str<strong>on</strong>g> well barriers and risk is correctly assessed or viewed in a c<strong>on</strong>text.<br />

Requirement:<br />

• The Activity Regulati<strong>on</strong>s, relating to Planning, which require that, in the planning <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

activities, the resp<strong>on</strong>sible party shall ensure that important c<strong>on</strong>tributors to risk are<br />

kept under c<strong>on</strong>trol, both individually and collectively, and that the planning shall take<br />

into account the status <str<strong>on</strong>g>of</str<strong>on</strong>g> important c<strong>on</strong>tributors to risk and to the change in risk.<br />

5.1.21 N<strong>on</strong>-c<strong>on</strong>formity 21. Risk c<strong>on</strong>tributors are removed from the detailed program<br />

The detailed plan <strong>on</strong> SNA for running the scab-liner through the BOP was changed and<br />

completed by the drilling supervisor and toolpusher <strong>on</strong> 26 November 2004. This was a direct<br />

c<strong>on</strong>sequence <str<strong>on</strong>g>of</str<strong>on</strong>g> e-mail corresp<strong>on</strong>dence between the drilling supervisor and the program<br />

32 In his everyday job, the lead well engineer is in the TO RESU organizati<strong>on</strong>.<br />